← Back to search

Gorteens , Slieverue , Co. Kilkenny

N/A

Planning application 22441

Kilkenny - Kilkenny County Council

Proposed Development

for a maintenance building and associated site works at Belview Port. The building is to provide storage for port vehicles, workshops for the maintenance and storage of port machinery and equipment, ancillary office accommodation and welfare facilities

View the full application file on the council's planning portal →

Application Details

Location
Gorteens , Slieverue , Co. Kilkenny
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council

Timeline

Registration Date
8 July 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
22480CONDITIONAL21 Jul 2022

for a Maintenance Building, roof mounted solar panels and associate site works at Belivew Port, the building is to provide storage for port vehicles, workshops for the maintenance and storage of port machinery and equipment, ancillary office accommodation and welfare facilities at

Gorteens , Slieverue , Co. Kilkenny

46m
22297CONDITIONAL10 May 2022

for the refurbishment of the existing gate house / security office at the main entrance to Belview Port to include new external cladding and windows, and a proposed extension to the existing structure to add toilet facility and associated site works

Gorteens , Slieverue , Co Kilkenny

66m
17763CONDITIONAL20 Nov 2017

for development which will consist of the construction of an extension (198.3m2) to an existing warehouse (Unit 7); the installation in the extension of a conditioning plant, aqueous waste storage tank and bagging unit for Air Pollution Control Residues (APCR); the acceptance of 38,000 tonnes of APCR and 2600 tonnes of aqueous waste annually, which will be in addition to the 95000 tonnes of waste currently authorised; the operation of the conditioning plant and bagging unit in the extension; the storage of the conditioned and bagged APCR in Unit 7 (1455.7m2), and the deletion of Condition 3 c) of planning permission P13/585. The APCR will be classified as hazardous waste. The development will require a review of the Industrial Emissions Licence granted by the Environmental Protection Agency. An Environmental Impact Assesment Report (EIAR) will be submitted

Belview Port , Gorteens , Co. Kilkenny

178m
19328CONDITIONAL17 May 2019

for a change of use at Units 3 and 4 Belview Port. It is intended to change its current warehousing use to allow for the acceptance and processing of non-hazardous waste into Solid Recovered Fuel (SRF) and for the composting of organic fines. The application will allow for acceptance and processing of up to 98,500 tonnes per annum at the facility. The application is accompanied by An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS)

Belview Port , Gorteens , Co. Kilkenny

211m
2460152CONDITIONAL29 Mar 2024

for development, at Unit 2, Belview Port, Gorteens, Co. Kilkenny. The development will consist of the amendment of condition no. 3 Pl. Ref. 11/397 to include for the acceptance, unloading and storage of non-hazardous waste including construction and demolition waste, end of life tyres and other non-hazardous bulk wastes for onward export. The application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS).

Unit 2 Belview Port , in the townland of Gorteens , Co Kilkenny

239m
2460656CONDITIONAL19 Dec 2024

for development, at Unit 1, Belview Port, Gorteens, Co. Kilkenny. The development will consist of the amendment of condition no. 3 Pl. Ref. 11/397 to include for the acceptance, unloading and storage of non-hazardous waste including construction and demolition waste, end of life tyres and other non-hazardous bulk wastes for onward export. The application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS)

Unit 1 Belview Port , in the townland of Gorteens , Co Kilkenny

252m
20738CONDITIONAL3 Nov 2020

for development at this site address. The development will consist of an ESB medium voltage (MV) Unit Substation and adjoining Customer Switchroom (an external footprint of up to 31m2, gross floor space of up to 19.5m2 and up to 3m in height) and all other associated site development works, including drainage and underground electrical cabling and ducting, required to facilitate the development. The substation development will be contained entirely within the boundary of the existing Belview Port and will use existing access arrangements within the port facility. The application is accompanied by a Natura Impact Statement (NIS)

Belview Port , Gorteens , Co Kilkenny

319m
20346CONDITIONAL8 Jun 2020

for water supply and foul drainage works including all pipes, valves, chambers, connections, a foul waste water pumping station and associated site works

Gorteens , Belview Port , Slieverue

337m
20769CONDITIONAL11 Nov 2020

for (1) (a) Permission for the proposed erection of a Fertiliser Storage unit together with all associated site works, landscaping and ancillary services on site including (b) the removal of the existing septic tank on site, and the proposed installation of a new treatment system on site to cater for foul water from site (c) the removal of the existing attenuation tank on site and the proposed installation of a new attenuation tank on site together with installation of a Bypass Separator with Flume monitoring equipment on the discharge from the surface water drainage on site, and for (2) Permission for Retention of a water storage tank for fire fighting purposes, pump house, storage shed and external storage area for sawdust. An Appropriate Assessment Screening Report forms part of the Planning Application

Gorteens , Slieverue , Co. Kilkenny

337m
20421N/A3 Jul 2020

for (1) Permission for the proposed erection of a Fertiliser Storage unit together with all associated site works, landscaping and ancillary services on site including the proposed installation of a new Tricel Novo package plant with Puraflo modules to cater for foul water from site together with security fencing to same, and the installation of a new Bypass Separator with Flume containing monitoring equipment on the discharge drainage from the Water Attenuation tank on site, and for (2) Permission for Retention of a Water Storage Tank for Fire Fighting purposes, Pump House, Storage shed, and external storage area for sawdust. An Appropriate Assessment Screening Report forms part of this Planning Application.

Gorteens , Slieverue , Co. Kilkenny

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?