Proposed Development

The development will consist of the demolition of 3 single storey structures, construction of a new building extension which will consist of a warehouse, forklift charging room, welfare facilities and all ancillary site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 May 2023

  2. Decision: CONDITIONAL

    4 Jul 2023

  3. Decision due

    6 Jul 2023

  4. Grant issued

    4 Aug 2023

Application Details

Location
Grannagh Business Complex , Ballygriffin , Co. Kilkenny
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council
Site Area
0.157 ha

Timeline

Registration Date
12 May 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
4 July 2023
Grant Date
4 August 2023
Permission Expires
3 August 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

16m
21114CONDITIONAL24 Feb 2021

for the following: Proposed two storey extension to the existing production facility at the front of site with all ancillary services and associated works along with a proposed water tank to the existing Car Park area

Grannagh , Ballygriffen , Co Kilkenny

23m
2460268CONDITIONAL7 Jun 2024

the development will consist of the relocation of the existing main entrance to the south west elevation, including a new wheelchair access ramp, access steps, planters, new entrance porch, the relocation of existing turnstiles, new security fencing, first floor corner window, alterations to south west and south east elevations consisting of new roof parapet to extend above the existing eaves level and new render finish. Application includes retention permission for the existing two-storey office extension located on the north west facing elevation of the main office building

Grannagh Business Park , Grannagh , Co. Kilkenny

55m
21628CONDITIONAL23 Jul 2021

for development at this site. The development will consist of the construction of a single storey store and welfare facilities building and all ancillary site works

Ballygriffin , Co. Kilkenny , X91 V224

78m
21659N/A30 Jul 2021

for upgrade works to their existing intake and processing facility. The development will consist of the construction of a single storey building extension to the existing building to incorporate a new pig intake including modifications to the internal building layout and modifications to the external yard and boundary fence and all ancillary site works

Ballygriffin , Co. Kilkenny , X91 V224

78m
21716CONDITIONAL19 Aug 2021

for upgrade works to existing intake and processing facility. The development will consist of the demolition of a single storey intake structure and the removal of existing cladding on a single storey processing facility to facilitate the construction of a single storey building extension to the existing building which incorporates a new pig intake including modifications to the internal building layout and modifications to the external yard, boundary fence and all ancillary site works

Ballygriffin , Co. Kilkenny , X91 V224

81m
2360546CONDITIONAL29 Nov 2023

for development at this site. The development will consist of : erecting a 2MW Wind Turbine, located to the southwest of our main building; the Wind Turbine will be installed with a hub height of 64 meters and a blade radius of 35.5 meters, with underground ducting connecting to the existing ESB substation and all associated site works at Queally Pig Slaughtering Limited T/A Dawn Pork and Bacon. The application relates to the development which comprises of an activity which holds an Integrated Pollution Control Licence (IPC) (Licence No. P0175-02)

DAWN PORK & BACON , GRANNAGH BUSINESS COMPLEX GRANNAGH , WATERFORD CO KILKENNY

87m
211048CONDITIONAL22 Dec 2021

for development at this site. The development will consist of the installation of a photovoltaic solar panel array approximately 2125m2 on the roof of existing buildings and all ancillary site works

Ballygriffin , Co Kilkenny , X91 V224

87m
20902CONDITIONAL21 Dec 2020

for (a) Permission for development at this site, which will consist of the installation of a photovoltaic solar panel array approximately 1650m2 on the roof of existing buildings and all ancillary site works

Ballygriffin , Co.Kilkenny , X91 V224

120m
20861N/A11 Dec 2020

for the construction of a single storey dry goods storage building and all ancillary site works

Ballygriffin , Co. Kilkenny , X91 V224

137m
2460157CONDITIONAL3 Apr 2024

for the construction of 2no. cold store buildings (1468m2 x 2), 1no. out loading building (695m2) with a link corridor (63m2) to the existing building, and associated site works including a proposed yard, access road, boundary treatments, concrete paving, drainage works, landscaping and the demolition of 1no. existing building. The cold stores and out loading building are to be used for the storage and dispatch of food related products at their site