← Back to search

Boleybeg , Spink , Co. Laois

CONDITIONAL

Planning application 1751

Laois - Laois County Council

Proposed Development

1. construct a two storey extension to the rear of the existing dwelling. 2. To construct a single storey extension to the side and rear of the existing dwelling. 4.Internal and elevational modifications. 5. Demolition of existing single storey rear extension. 6. Modification of existing site boundaries. 7. Provision of a new sewage treatment plant and percolation area. 8. Provision of a new domestic vehicular site entrance and all associated site developments works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Feb 2017

  2. Decision: CONDITIONAL

    27 Mar 2017

  3. Decision due

    30 Mar 2017

  4. Grant issued

    28 Apr 2017

Application Details

Location
Boleybeg , Spink , Co. Laois
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Laois County Council
Site Area
0.796 ha
Floor Area
151 sq m
Residential Units
1

Timeline

Registration Date
3 February 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 March 2017
Grant Date
28 April 2017
Permission Expires
27 April 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

910m
20573CONDITIONAL4 Nov 2020

change use of therapeutic farm buildings previously granted under Planning reference 98/490 to a dwelling house and store cum fuel shed, including retention of any changes to elevations and retention of extension to store cum fuel shed

Graiguenasmuttan , Spink , Abbeyleix

1.0km
2360336CONDITIONAL29 Aug 2023

demolish an existing single storey extension and the demolition of attached outbuilding, permission for the construction of a new two storey extension with basement plant room and minor alterations to existing dwelling, a new waste water treatment system plus all associated site works

Knockardagur , Abbeyleix , Co. Laois

1.2km
2660083N/A16 Feb 2026

retain change of use of Knock Community Centre to Early Years and School Aged sessional services between the hours of 8am to 6pm Monday to Friday and all associated site works

Knock Community Centre , Boleybeg Spink , Co. Laois.

1.2km
2660102CONDITIONAL25 Feb 2026

retain change of use of Knock Community Centre to Early Years and School Aged sessional services between the hours of 8am to 6pm Monday to Friday and all associated site works.

Knock Community Centre , Boleybeg Spink , Co. Laois.

1.2km
2560598N/A18 Sept 2025

retain change of use of Knock Community Centre to creche and afterschool service between the hours of 8am to 6pm Monday to Friday and all associated site works

Knock Community Centre , Boleybeg Spink , Co. Laois.

1.2km
247CONDITIONAL12 Jan 2024

1. retain existing storage / slatted shed and storage tank capacity 113 cubic meters, 2. permission to construct extension to existing slatted shed to include oassageway, slatted shed and slatted tank capacity 149 cubic meters and all associated site works

Boleybeg , Abbeyleix , Co. Laois

1.3km
20331CONDITIONAL6 Jul 2020

construct a two storey dwelling house, domestic garage, a packaged wastewater treatment system and polishing filter, new shared entrance and all associated and necessary site works

Clarbarracum , Ballyroan , Co. Laois

1.4km
2560635N/A6 Oct 2025

construct a new dwelling house, garage, treatment system with polishing filter, new site entrance and all associated site works

Graiguenahown , Abbeyleix , Co. Laois

1.4km
2560657CONDITIONAL14 Oct 2025

Construct a new dwelling house, garage, treatment system with polishing filter, new site entrance and all associated site works

Graiguenahown , Abbeyleix , Co. Laois

1.4km
1787CONDITIONAL16 Feb 2017

provide (a) multi games area with associated perimeter fence and lighting; lighting to walking path around pitch and (c) RETENTION permission for 4 no. floodlights and all associated site works

Boleybeg , Spink , Co. Laois

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?