← Back to search

Cappakeel , Emo , Co.Laois

CONDITIONAL

Planning application 1948

Laois - Laois County Council

Proposed Development

construct a dwelling house, domestic garage/fuel shed, septic tank with secondary treatment system and new entrance

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    31 Jan 2019

  2. Further information requested

    15 Mar 2019

  3. Further information received

    12 Sept 2019

  4. Decision: CONDITIONAL

    2 Oct 2019

  5. Decision due

    9 Oct 2019

  6. Grant issued

    6 Nov 2019

Application Details

Location
Cappakeel , Emo , Co.Laois
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Laois County Council
Site Area
0.334 ha
Floor Area
273 sq m
Residential Units
1

Timeline

Registration Date
31 January 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
2 October 2019
Grant Date
6 November 2019
Permission Expires
5 November 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

116m
20613CONDITIONAL26 Nov 2020

construct an extension to cattle shed, also construct concrete apron adjacent to the south-east side of the shed.

Cappakeel , Emo , Co. Laois

137m
21379CONDITIONAL27 May 2021

open new entrance to my farmyard and erect sliding gate and concrete piers

Cappakeel , Emo , Portlaoise Co. Laois

169m
18379CONDITIONAL26 Jun 2018

construct a detached garage and associated ancillary works

Cappakeel , Emo , Co. Laois

503m
18689CONDITIONAL15 Nov 2018

renovate, extend and new waste water treatment system to cottage

Cappakeel , Emo , Co.Laois

503m
18685N/A12 Nov 2018

renovate cottage with extensions to same and new waste water treatment system in accordance with EPA 2009

Cappakeel , Emo , Laois

569m
20320CONDITIONAL29 Jun 2020

construct a new dwelling house with garage, treatment system with percolation area, new well, new site entrance and all associated site works

Cappakeel , Emo , Portlaoise Co. Laois

623m
18719N/A28 Nov 2018

retain extension to rear and side of existing cottage, porch entrance and amendments to front elevation and all associated site works

Cappakeel , Emo , Co.Laois

644m
20319N/A29 Jun 2020

construct a storey & half type dwelling with single storey element & domestic garage with effluent treatment system & percolation area with new vehicular entrance and all associated site works.

Cappakeel , Emo , Co. Laois

677m
19731N/A23 Dec 2019

construct storey & half type dwelling with single storey element and domestic garage with effluent treatment system & percolation area with new vehicular entrance and all associated site works

Cappakeel , Emo , Co. Laois

743m
2560148CONDITIONAL24 Mar 2025

develop at this site within the Townlands of Morett, Killone, Cappakeel, Rossmore and Raheennahown north, Co. Laois. The development will consist of a 10-year permission and 40-year operational life for a solar farm on 5 no. land parcels as described herein: West Parcel (A) (Morett townland), Central West Parcel (B) (Morett & Cappakeel. townlands), Centre Parcel (C) (Morett & Cappakeel. townlands), Centre East Parcel (D) (Cappakeel townland) and East Parcel (E) (Rossmore townland). The total site area for the proposed development is c. 249 hectares and consists of the following; c. 1,796,838sq. metres of solar photovoltaic panels on ground mounted steel frames; 44 no. hardstandings for electrical skids and storage; underground power and communication cables and ducts; c. 22,753m. of boundary security fencing; c. 12,915m. of new and existing internal access tracks including 2 no. open span bridge crossings; associated drainage infrastructure; 5 no. site entrances which include the upgrading of 2 no. access points onto the L3930, 1 no. new access point onto the L7815 local road and 2 no. new access points onto the L3930 local public road; 5 no. temporary construction compounds; landscaping and biodiversity enhancement measures and all associated site services and works. Installations of internal network cable comprise trenching for an underground medium voltage electrical cable and associated joint bays and infrastructure, for a distance of approximately 7,189 metres in length along the solar farm lands including 4 no. Horizonal Directional Drilling points to traverse the Dunrally stream and the local roads L3930, L3901 and L3817. A separate planning application will be made to An Bord Pleanála as part of a Strategic Infrastructure Development (SID). This will include the provision of a 110kV substation with electrical control building and ancillary electrical infrastructure, associated compound with palisade fence which is to be located in the West Parcel (A) in the townland of Morett. The substation will connect to the national grid via. A LILO grid connection onsite. This planning application will be lodged with An Bord Pleanála in due course. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this planning application.

Townlands of Morett Killone , Cappakeel Rossmore and Raheennahown North , Co. Laois.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?