← Back to search

Acragar , Mountmellick , Co. Laois

N/A

Planning application 21475

Laois - Laois County Council

Proposed Development

construct new dormer dwelling house, domestic garage, new vehicular entrance and all associated ancillary works

View the full application file on the council's planning portal →

Application Details

Location
Acragar , Mountmellick , Co. Laois
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Laois County Council

Timeline

Registration Date
2 July 2021Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2560130N/A18 Mar 2025

Revisions to previously granted planning permission reg. ref. no. 21/607. These revisions consist of 1) changing from a dormer to a single storey dwelling 2) reduction in overall floor area from 182.2 sqm to proposed 124.5 sqm and 30 revised fenestration to suit the above adjustments.

Acragar , Mountmellick , Co. Laois

0m
2560144CONDITIONAL24 Mar 2025

Revision to previously granted planning permission reg. ref. no. 21/607. These revisions consist of 1) changing from a dormer to a single storey dwelling 2) reduction in overall floor area from 182.2 sqm to proposed 124.5 sqm and 30 revised fenestration to suit the above adjustments.

Acragar , Mountmellick , Co. Laois

1m
21440N/A18 Jun 2021

construct new dormer dwelling house, domestic garage, new vehicular entrance and all associated ancillary works

Acragar , Mountmellick , Co. Laois

7m
21607CONDITIONAL1 Sept 2021

construct new dormer dwelling house, domestic garage, new vehicular entrance and all associated ancillary works

Acragar , Mountmellick , Co. Laois

110m
21341CONDITIONAL18 May 2021

retain the existing 18m high monopole telecommunications support structure together with antennas, dishes and associated equipment and fencing

A1 Metal Recycling , Acragar , Mountmellick

267m
17370N/A13 Jul 2017

construct a two-storey extension to the side elevation of our existing dwelling together with all ancillary services and associated site works

19 Brockview , Mountmellick , Co. Laois

267m
17386CONDITIONAL18 Jul 2017

construct a two-storey extension to the side elevation of our existing dwelling together with all ancillary services and associated site works

19 Brockview , Mountmellick , Co. Laois

425m
22460N/A22 Jul 2022

A) demolish existing building, B) build 32 two bedroom apartments, in four, two storey blocks, C) bin bays and cycle shelters, D) 61 parking spaces, E) site entrance and all associated site works

Davitt Road , Mountmellick , Co. Laois

439m
18389CONDITIONAL4 Jul 2018

retain attic conversion to habitable room including velux windows, garage to habitable room and all associated site works

Acragar , Mountmellick , Co. Laois

462m
2560782CONDITIONAL24 Nov 2025

construct 43 no. housing units comprised of: - 4 no. two-storey/two bedroom/end-of-terrace dormer bungalows - 5 no. two-storey/two-bedroom/mid-terrace dormer bungalows - 2 no. two-storey/three-bedroom/end-of-terrace dwellings - 2 no. two-storey/two-bedroom/mid-terrace dwellings - 24 no. two-storey/three-bedroom/semi-detached dwellings - 6 no. two-storey/four-bedroom/semi-detached dwellings Permission is also sought for the removal of a section of the existing boundary screen wall, creation of a new entrance road, vehicular + pedestrian entrances and related footpaths onto Grange Hall, together with the installation of all necessary and associated site works, to include watermain, foul and surface water networks, 1 No. foul pump station, and all other necessary infrastructure, landscape and associated site works related to the development. Please note that a Natura Impact Statement (NIS) has been prepared and submitted with this application.

Ballycullenbeg , Mountmellick , Co. Laois

The submission window has closed

Observations on this application closed on Thursday 5 August 2021, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?