Ballymacken , Portlaoise , Co. Laois

CONDITIONAL

Planning application 22325

Laois - Laois County Council

Proposed Development

retain changes to elevations, a refrigerator unit as constructed on the southern part of the site and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    24 May 2022

  2. Decision: CONDITIONAL

    13 Jul 2022

  3. Decision due

    18 Jul 2022

  4. Grant issued

    15 Aug 2022

Application Details

Location
Ballymacken , Portlaoise , Co. Laois
Applicant
N/A
Application Type
RETENTION
Planning Authority
Laois County Council
Site Area
1 ha
Floor Area
12 sq m
Residential Units
1

Timeline

Registration Date
24 May 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
13 July 2022
Grant Date
15 August 2022
Permission Expires
14 August 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

10m
2360247CONDITIONAL30 Jun 2023

construct a loading dock and ramp to existing industrial building and all associated site works.

Ballymackan , Portlaoise , Co. Laois.

14m
2360241N/A27 Jun 2023

Permission for a loading dock and ramp to existing industrial building and all associated site works.

Ballymackan , Portlaoise , Co. Laois.

14m
2360246N/A29 Jun 2023

Permission for a loading dock and ramp to existing industrial building and all associated site works.

Ballymackan , Portlaoise , Co. Laois.

104m
22339CONDITIONAL1 Jun 2022

1. change of building location and all associated elevational changes. 2. change of use of floor space from warehouse to offices and all associated elevational changes. 3. Existing pump house as constructed and 4. all associated works

Ballymacken , Portlaoise , Co. Laois

114m
17535CONDITIONAL3 Oct 2017

demolish existing industrial unit and permission to build a new commercial unit, site carparking, upgrade existing site entrance including new roller gate, new gated entrance and all associated site works

Ballymacken , Portlaoise , Co. Laois

136m
22285N/A10 May 2022

retain changes to 1. the elevations as constructed, 2. the use of floor area from warehousing to office space, 3. first floor office area, 4. revised site boundary including the erection of a 2.4m high palisade fence erected to the east and south boundaries

Ballymacken , Portlaoise , Co Laois

138m
2460023CONDITIONAL22 Jan 2024

1. retain existing single storey mono pitched extension on the southern elevation of the existing building 3 measuring 15m x 6m x 4m high. 2. The partial demolition of fire damaged Buildings 1 & 2 with the recladding and retention of the northern portion of Building 2 3. The retention and reuse of the cleared area of building 1 and 2 as storage 4. The construction of a new palisade fence and gate on the northern boundary

Ballymacken , Portlaoise , Laois

141m
22407N/A5 Jul 2022

retain changes to 1. the elevations as constructed, 2. the use of floor area from warehousing to office space, 3. first floor office area, 4. revised site boundary including the erection of a 2.4m high palisade fence erected to the east and south boundaries

Ballymacken , Portlaoise , Co Laois

146m
22137N/A11 Mar 2022

retention of changes to 1. the elevations as constructed, 2. use of floor area from warehousing to office space, 3. first floor office area. 4. revised site boundary including the erection of a palisade fence to the east and south boundaries and all associated site works

Ballymacken , Portlaoise , Co. Laois

151m
22143N/A14 Mar 2022

retain changes to 1. the elevations as constructed, 2. use of floor area from warehousing to office space, 3. first floor office area. 4. revised site boundary including the erection of a 2.4m high palisade fence to the east and south boundaries and all associated site works

Ballymacken , Portlaoise , Co. Laois

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?