← Back to search

Meelick , Rosenallis , Co. Laois

N/A

Planning application 2280

Laois - Laois County Council

Proposed Development

change external material on existing cottage to change from Render to Natural stone and from natural stone to timber on the kitchen annex as well as moving the kitchen annex window on the East Elevation and the removal of the existing chimney

View the full application file on the council's planning portal →

Application Details

Location
Meelick , Rosenallis , Co. Laois
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Laois County Council

Timeline

Registration Date
22 February 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
18195CONDITIONAL29 Mar 2018

install a septic tank and percolation area, demolition of the front porch and the replacement of the side annex of the existing house with a new 21 sq m extension, the provision of a 135sq.m. extension to the rear of the property and associated site works

Meelick , Rosenallis , Co. Laois

20m
22281CONDITIONAL9 May 2022

change external material on existing cottage to change from Render to Natural stone and from natural stone to timber on the kitchen annex as well as moving the kitchen annex window on the East Elevation and the removal of the existing chimney.

Meelick , Rosenallis , Co. Laois

297m
21855CONDITIONAL10 Dec 2021

(A) demolish existing rear extension and detached store, (B) construct a part 2-storey, part single storey extension to side and rear of existing 2 storey farm house, (C) decommission existing septic tank and install a proprietary wastewater treatment system and all associated site development works

Meelick , Rosenallis , Co. Laois

475m
2660271N/A14 May 2026

construct a single-storey dwelling house, entrance, garage, treatment system with polishing filter and all associated site works

Meelick , Rosenallis , Co. Laois

942m
2560700CONDITIONAL24 Oct 2025

(1) construct new extensions to an existing farm building for housing livestock including a new internal underground single slatted slurry storage tank and a new internal underground double slatted slurry storage tank, completed with associated siteworks, (2) construct a new farm building for housing livestock including a new internal underground single slatted slurry storage tank, completed with associated siteworks, (3) construct a new farm building for general storage use, completed with associated siteworks, (4) replace existing silage slab with a new silage slab including a side retaining wall, completed with associated siteworks, and (5) construct a new animal feeds storage silo, completed with associated siteworks. A NIS has been received on this application on request of a Section 177 T (5).

Meelick , Rosenallis , Co Laois

1.3km
22420N/A12 Jul 2022

renovate a single storey bungalow with an extension to the rear, gable end and front of the proposed residential development

Drummond , Rosenallis , Co. Laois

1.3km
20123CONDITIONAL9 Mar 2020

construct a new three bedroom one storey dwelling house, new vehicular entrance, new domestic garage, new effluent treatment system, new bored well and all associated site development works

Drummond , Rosenallis , Co. Laois

1.3km
20172N/A30 Mar 2020

construct a small extension to the rear and gable end of the house. I also intend to change the house from a bungalow to a dormer bungalow

Drummond , Rosenallis , Co. Laois

1.3km
20190CONDITIONAL17 Apr 2020

construct a small extension to the rear and gable end of the house and also to change the house from a bungalow to a dormer bungalow

Drummond , Rosenallis , Co.Laois

1.3km
22666CONDITIONAL26 Oct 2022

retain domestic garage carport , sheds and all associated site works

Meelick , Rosenallis , Co. Laois R32 K8P8M

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?