Proposed Development
construct a dormer bungalow, septic tank and percolation area, entrance driveway and all associated site works
View the full application file on the council's planning portal →Application Details
- Location
- Drim , Mountrath , Co. Laois
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Laois County Council
Timeline
- Registration Date
- 25 October 2023
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construct a dormer bungalow, septic tank and percolation area, entrance driveway and all associated site works
Drim , Mountrath , Co. Laois
retain a domestic extension containing play room, family room and utility, together with all ancillary services at this site
Drim , Mountrath , Laois
CONSTRUCT A SINGLE-STORY SIDE SUNROOM EXTENSION TO EXISTING DETACHED DORMER BUNGALOW, RETENTION OF EXISTING SINGLE STORY DOMESTIC GARAGE AS CONSTRUCTED AND ALL ASSOCIATED SITE WORKS.
PADDOCK , MOUNTRATH , CO.LAOIS
provide astro turf playing surface, associated lighting and fencing and all associated site works
Deerpark , Mountrath , Co. Laois.
retain existing permanent mature hedgerow boundary to the west elevation of the site, which is an amendment to P.I. ref. 92/316
Drim , Mountrath , Co. Laois
retain existing permanent mature hedgerow boundary to the west elevation of the site, which is an amendment to Pl. ref. 92/316
Drim , Mountrath , Co. Laois
retain house as originally built, existing location on site and existing site boundaries
Paddock , Mountrath , Co. Laois
retain house as originally built, existing location on site and existing site boundaries
Paddock , Mountrath , Co. Laois
retain house as originally built, existing location on site and existing boundaries at this site
Paddock , Mountrath , Co. Laois
construct a dwelling house, new site entrance, septic tank and all associated site works
Drim , Mountrath , Co.Laois
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?