← Back to search

Grange , Maganey , (via Carlow) Co. Laois

N/A

Planning application 2360102

Laois - Laois County Council

Proposed Development

The development will consist of alterations and refurbishment of an existing single storey dwelling; a new two-storey dormer extension to rear/west; erection of detached garage and the provision of new boundary wall treatments and all other associated site excavation, infrastructural and site development works above and below ground.

View the full application file on the council's planning portal →

Application Details

Location
Grange , Maganey , (via Carlow) Co. Laois
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Laois County Council
Site Area
0.402 ha

Timeline

Registration Date
20 March 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
2360115CONDITIONAL28 Mar 2023

alter and refurbish an existing single storey dwelling; a new two-storey dormer extension to rear/west; erection of detached garage and the provision of new boundary wall treatments and all other associated site excavation, infrastructural and site development works above and below ground.

Grange , Maganey , (via Carlow) Co. Laois

51m
1933CONDITIONAL23 Jan 2019

construct a single storey dwelling, bored well, septic tank and percolation area, new entrance, domestic garage and all associated site works

Grange Maganey , Co.Laois

105m
21511CONDITIONAL15 Jul 2021

construct a new dwelling house, domestic garage, domestic well, waste water treatment system, and percolation area, including all associated site and landscape works

Grange , Maganey , Athy

128m
2333CONDITIONAL1 Feb 2023

retain a front porch of an existing dwelling house

Grange , Maganey , Co. Laois

150m
21510CONDITIONAL15 Jul 2021

construct a new dwelling house, domestic garage, domestic well, waste water treatment system and percolation area, including all associated site and landscape works.

Grange , Maganey , Co. Laois

197m
2460598CONDITIONAL10 Oct 2024

retain alterations to previously granted planning application PL. No. 09/102 to include retention permission for a domestic garage as constructed and permission to complete same, and all associated site works.

Ballyfoyle , Maganey , Co. Laois

304m
18523CONDITIONAL4 May 2018

development at the Public Landing Jetty Below Maganey Bridge, the development will consist of the improvement and upgrading of the existing public landing jetty by replacing the damaged and deteriorating walkway with a slip resistant decking material and repairing the river bank along the length of the jetty to prevent future erosion and undercutting of the bank. A Natura Impact Statement has been prepared for the project and submitted with the application.

Public Landing Jetty , Below Maganey Bridge , Maganey Lower

307m
18429N/A18 Apr 2018

development at the public landing jetty below Maganey Bridge, which will consist of the improvement and upgrading of the existing public landing jetty by replacing the damaged and deteriorating walkway with a slip resistant decking material and repairing the river bank along the length of the jetty to prevent future erosion and undercutting of the bank. A Natura Impact Statement has been prepared for the project and submitted with the application, works

Below Maganey Bridge , Maganey Lower

329m
2660584CONDITIONAL28 Aug 2026

change of design on previously approved planning permission reg 22/205 to new designed Bungalow Type Dwelling & domestic garage with Effluent Treatment System & Percolation Area with previously approved vehicular entrance and all associated site works.

Grange Maganey , Athy , Co. Laois

344m
22205CONDITIONAL7 Apr 2022

construct a new dwelling house, domestic garage, domestic well, waste water treatment system and percolation area, including all associated site and landscape works

Grange , Maganey , Athy

The submission window has closed

Observations on this application closed on Sunday 23 April 2023, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?