demolish the rear single-storey extension and side garage, alterations to and the construction of a single-storey extension to rear of existing dwelling house, a detached storage shed/domestic garage, closing of the existing site entrance and relocating site entrance to the existing field gateway further north; and all associated siteworks and services and Retention Permission for the erection of a mobile home to the northern boundary of the site for the duration of the above construction works and associated services

View the full application file on the council's planning portal →

Application Details

Location
Tintore , Ballacolla , Co. Laois
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Laois County Council
Site Area
0.47 ha

Timeline

Registration Date
15 December 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2360539CONDITIONAL18 Dec 2023

Demolition of the rear single-storey extension and side garage, alterations to and the construction of a single-storey extension to rear of existing dwelling house, a detached storage shed/domestic garage, closing of the existing site entrance and relocating site entrance to the existing field gateway further north; and all associated siteworks and services and Retention Permission for the erection of a mobile home to the northern boundary of the site for the duration of the above construction works and associated services

Tintore , Ballacolla , Co. Laois

201m
22735CONDITIONAL6 Dec 2022

construct a dormer style dwelling house, domestic garage, septic tank and percolation area, new entrance and all associated and necessary site works

Aghmacart , Rathdowney , Co. Laois

473m
19204N/A9 Apr 2019

partially demolish existing dwelling, part single storey extension, part two storey extension and part refurbishment of the existing dwelling, a new garage, a new shed and all associated site and boundary works

Rathdowney Road , Ballacolla , Portlaoise

473m
19208CONDITIONAL12 Apr 2019

partially demolish existing dwelling, part single storey extension, part two storey extension and part refurbishment of the existing dwelling, a new garage, a new shed and all associated site and boundary works

Ballacolla , Portlaoise , Co.Laois

697m
22377CONDITIONAL20 Jun 2022

construct 6 No. 18m floodlighting columns, signage, noticeboard and associated site works and retention permission for 8 No. 4.5m floodlighting columns, 4 No. dugouts, 2 No. ballstop nets, storage container and scoreboard

The Hawthorn Field , Ballacolla , Co. Laois

879m
2560304CONDITIONAL20 May 2025

carry out the following development • Demolition of existing structures on site to include existing clubhouse and associated outbuildings (c. 1,567 sqm overall); • Construction of a new clubhouse, grandstand, and indoor training facility measuring c.10,122 sqm GFA to include: an indoor training field (c. 6,175 sqm), changing rooms, communal areas, café/merchandise shop, town hall, gym, physio room, comms room, a function room and associated kitchen, bar, 2 no. meeting rooms, 4 no. outdoor handball courts, plant rooms, ESB substation, and ancillary storage rooms; • Amendments to the layouts of existing 5 no. natural grass outdoor training pitches, including spectator fencing and 400 LUX floodlighting to 1 no. natural grass pitch, realignment of ball stop netting, and associated works; • Conversion of existing grass pitch to 1 no. all weather synthetic pitch, with the inclusion of new floodlights (400 LUX), spectator fencing, ball stop netting and associated works; • Provision of 4 no. dug outs and 2 no. scoreboards; • 1 no. spectator seating terrace measuring 11.16m in height with seating capacity for c. 420 no. spectators; • Relocation of the existing car park to provide 227 no. car parking spaces (to incl. 13 no. accessible spaces and 23 no. EV spaces), bus set down area and 4 no. bus sparking spaces, with additional overflow parking available; • Works to the R425 road to provide traffic calming measures in the form of concrete buildouts, islands, a pedestrian crossing, and associated line marking and signage; • The re-design of the existing vehicular entrance along the R425 road to provide pedestrian/cycle access; • Provision of a new emergency vehicle entrance only onto the R425; • Provision of 227 no. cycle parking spaces; • Provision of static storage for firefighting; • Amendments to and the extension of the existing amenity track and lighting; • All associated boundary treatments including the retention of existing hedgerow along all boundaries; • All associated site development works and services, including foul water pumping station and rising main, irrigation well with pump, and all associated hard and soft landscaping including mounding, footpaths, pitch fencing, planting and landscaping works.

Portlaoise GAA , Rathleague Portlaoise , Co. Laois

879m
2560326CONDITIONAL29 May 2025

change of use of two meeting rooms, adjoining toilets and entrance hallway to a preschool service (entrance hallway to be shared with community building); new double doors to rear in place of existing window; and change of use of the rear grassed area to an outdoor uncovered grassed area for the preschool, enclosed by a new timber fence and gate

Hawthorn Community Building , Ballacolla , Laois

881m
2560227N/A18 Apr 2025

change of use of two meeting rooms to a preschool service and change of use of the rear grassed area to an enclosed outdoor area for the preschool.

Hawthorn Community Building , Ballacolla , Laois

881m
2560265N/A1 May 2025

change of use for a section of the Hawthorn Community Building, Ballacolla, Co. Laois, R 32R8HN. The development will consist of change of use of two meeting rooms to a preschool service and change of use of the rear grassed area to an enclosed outdoor area for the preschool.

Hawthorn Community Building , Ballacolla , Laois

881m
2560322N/A27 May 2025

change use of two meeting rooms, adjoining toilets and entrance hallway to a preschool service (entrance hallway to be shared with community building); new double doors to rear in place of existing window; and change of use of the rear grassed area to an outdoor uncovered grassed area for the preschool, enclosed by a new timber fence and gate.

Hawthorn Community Building , Ballacolla , Laois

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?