← Back to search

Ballymacken , Portlaoise , Laois

CONDITIONAL

Planning application 2460023

Laois - Laois County Council

Proposed Development

1. retain existing single storey mono pitched extension on the southern elevation of the existing building 3 measuring 15m x 6m x 4m high. 2. The partial demolition of fire damaged Buildings 1 & 2 with the recladding and retention of the northern portion of Building 2 3. The retention and reuse of the cleared area of building 1 and 2 as storage 4. The construction of a new palisade fence and gate on the northern boundary

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Jan 2024

  2. Decision: CONDITIONAL

    12 Mar 2024

  3. Decision due

    17 Mar 2024

  4. Grant issued

    15 Apr 2024

Application Details

Location
Ballymacken , Portlaoise , Laois
Applicant
N/A
Application Type
RETENTION
Planning Authority
Laois County Council
Site Area
0.43 ha

Timeline

Registration Date
22 January 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 March 2024
Grant Date
15 April 2024
Permission Expires
14 April 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

33m
17535CONDITIONAL3 Oct 2017

demolish existing industrial unit and permission to build a new commercial unit, site carparking, upgrade existing site entrance including new roller gate, new gated entrance and all associated site works

Ballymacken , Portlaoise , Co. Laois

102m
2172CONDITIONAL10 Feb 2021

retain extensions (area: 875 sq.m) to a warehouse manufacturing unit comprising of (i) an infill section connecting two existing manufactureing warehouses and (ii) a new assembly warehouse unit to the west of the existing development and the provision of all other associated site excavation, infrastructural and site development works above and below ground

Ballymacken , Portlaoise , Co. Laois

102m
2660294N/A20 May 2026

a) construction of an extension to the side of the existing facility to provide additional manufacturing floor space, b) construction of a new two-storey office area to the front, c) elevational changes to existing, d) vehicle and bicycle parking, new sliding gate access/ exit arrangements and all associated site works

Ballymackan , Portlaoise , Co. Laois

102m
2660303N/A22 May 2026

a) construction of an extension to the side of the existing facility to provide additional manufacturing floor space, b) construction of a new two-storey office area to the front, c) elevational changes to existing, d) vehicle and bicycle parking, new sliding gate access/ exit arrangements and all associated site works

Ballymackan , Portlaoise , Co. Laois

135m
2360247CONDITIONAL30 Jun 2023

construct a loading dock and ramp to existing industrial building and all associated site works.

Ballymackan , Portlaoise , Co. Laois.

138m
22325CONDITIONAL24 May 2022

retain changes to elevations, a refrigerator unit as constructed on the southern part of the site and all associated site works

Ballymacken , Portlaoise , Co. Laois

144m
2360241N/A27 Jun 2023

Permission for a loading dock and ramp to existing industrial building and all associated site works.

Ballymackan , Portlaoise , Co. Laois.

144m
2360246N/A29 Jun 2023

Permission for a loading dock and ramp to existing industrial building and all associated site works.

Ballymackan , Portlaoise , Co. Laois.

223m
22129REFUSED10 Mar 2022

extend duration on planning permission ref: 17/104

Ballymacken , Portlaoise , Co. Laois

242m
22339CONDITIONAL1 Jun 2022

1. change of building location and all associated elevational changes. 2. change of use of floor space from warehouse to offices and all associated elevational changes. 3. Existing pump house as constructed and 4. all associated works

Ballymacken , Portlaoise , Co. Laois