← Back to search

Ballinaclough Lower The Rath Timahoe , Portlaoise , Co Laois

N/A

Planning application 2460222

Laois - Laois County Council

Proposed Development

Import inert soil and stone (EWC class 170504 & class 170508) not exceeding 250,000 m3 for the purpose of restoring a portion of an existing registered sand and gravel pit (QY05/11) to agricultural grassland over an area of 8.3 ha, installation of a temporary wheel wash facility along with alterations to an existing site entrance. The development will require a waste facility permit.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 Apr 2024

  2. Further information requested

    18 Jun 2024

  3. Further information received

    11 Dec 2024

Application Details

Location
Ballinaclough Lower The Rath Timahoe , Portlaoise , Co Laois
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Laois County Council
Site Area
8.3 ha

Timeline

Registration Date
25 April 2024
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2560715N/A30 Oct 2025

import up to 200,000 ton of brownfield waste or article 27 material and 50,000 ton of greenfield material under article 27 for the purpose of restoring a portion of an existing registered sand and gravel pit (QY 05/11) to agricultural grassland, installation of a temporary wheel wash facility along with alterations to an existing site entrance. A Natura Impact Assessment (NIS) has been prepared and will be submitted along with the application to the planning authority. A waste facility permit will be required for the proposed development

Ballinaclough Lower The Rath , Timahoe Portlaoise , Co Laois

0m
2660014N/A15 Jan 2026

import up to 200,000 ton of brownfield waste or article 27 material and 50,000 ton of greenfield material under article 27 over a 10 year period for the purpose of restoring a portion of an existing registered sand and gravel pit (QY 05/11) to agricultural grassland, installation of a temporary wheel wash facility along with alterations to an existing site entrance. A Natura Impact Assessment (NIS) has been prepared and will be submitted along with the application to the planning authority. A waste facility permit will be required for the proposed development

Ballinaclough Lower The Rath , Timahoe Portlaoise , Co Laois

333m
20244CONDITIONAL22 May 2020

erect general purpose farm shed and all associated site works

Ballinaclough , Timahoe , Co. Laois

348m
23100CONDITIONAL24 Mar 2023

construct new cubicle shed to extend existing parlour and all associated site works

Ballinaclough , Timahoe , Co. Laois

348m
2560730N/A7 Nov 2025

change previously granted pl. ref. 23/100. Namely disconnect proposed shed from existing parlour, changes to steel sizes and roof pitch to meet Department of Agriculture standards and all associated site works

Ballinaclough Lower , Timahoe , Co. Laois

348m
2560734CONDITIONAL11 Nov 2025

change previously granted pl. ref. 23/100. Namely disconnect proposed shed from existing parlour, changes to steel sizes and roof pitch to meet Department of Agriculture standards and all associated site works

Ballinaclough Lower , Timahoe , Co. Laois

348m
19234N/A29 Apr 2019

erect general purpose farm shed and all associated site works

Ballinaclough , Timahoe , Co.Laois

348m
19259CONDITIONAL16 May 2019

erect general purpose farm shed and all associated site works

Ballinaclough , Timahoe , Co.Laois

750m
18273CONDITIONAL2 May 2018

demolition of extension to rear of existing cottage and replace with new extension, renovate and modify existing cottage, provide waste water treatment system and polishing filter and site entrance

Raheenduff Big , Timahoe , Co. Laois

806m
19161CONDITIONAL21 Mar 2019

construct a dwelling house, garage, entrance, treatment system, percolation area and associated site works

Timahoe , Portlaoise , Co.Laois

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?