← Back to search

Errill village , Errill , Co. Laois

CONDITIONAL

Planning application 2460420

Laois - Laois County Council

Proposed Development

Retain 3 no. domestic stores and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 Jul 2024

  2. Decision: CONDITIONAL

    5 Sept 2024

  3. Decision due

    9 Sept 2024

  4. Grant issued

    7 Oct 2024

Application Details

Location
Errill village , Errill , Co. Laois
Applicant
N/A
Application Type
RETENTION
Planning Authority
Laois County Council
Site Area
0.071 ha

Timeline

Registration Date
16 July 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
5 September 2024
Grant Date
7 October 2024
Permission Expires
6 October 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

54m
18637CONDITIONAL22 Oct 2018

extend and renovate existing dwelling house and all associated site works

Errill , Co.Laois

181m
2560464CONDITIONAL31 Jul 2025

Retain a domestic garage building

Errill , Co Laois , Co Laois

214m
22677CONDITIONAL1 Nov 2022

construct 14 no. residential dwellings comprising 12 no. 3-bed semi-detached two storey dwellings (Type A1/A2), 2 no. 4-bed detached two storey dwellings (Type B1), together with a new vehicular entrance off the existing R433 road including provision of a new pedestrian path, all ancillary internal access roads, infrastructure, landscaping and boundary treatments, and all associated site and development works and services

Errill , Portlaoise , Co. Laois

272m
2560675N/A18 Oct 2025

construct a 2 bedroom apartment

1 Village View , Errill , Co. Laois

383m
2660339N/A3 Jun 2026

Construct a single-story extension (94 m²) to the rear/side of the existing bungalow to provide ancillary family accommodation, with a separate entrance and an internal connection to the main dwelling, together with all associated site works. The height of the proposed extensions is 4.18m.

Monamonra , Errill , Co. Laois

383m
2560495N/A18 Aug 2025

construct a single-story extension to the rear/side of the existing bungalow to provide ancillary family accommodation, with a separate entrance and an internal connection to the main dwelling, and a single-story extension to the existing kitchen and utility room, together with all associated site works

Monamonra , Errill , Co. Laois

383m
2560507CONDITIONAL21 Aug 2025

Construct a a single-story extension to the rear/side of the existing bungalow to provide ancillary family accommodation, with a separate entrance and an internal connection to the main dwelling, and a single-story extension to the existing kitchen and utility room, together with all associated site works

Monamonra , Errill , Co. Laois

383m
2660383N/A17 Jun 2026

revise design to that previously permitted under Planning Ref. No. 25/60507 and will comprise the construction of a single-storey extension (94m²) to the rear/side of the existing bungalow to provide ancillary family accommodation, with a separate entrance and an internal connection to the main dwelling, together with all associated site works. The height of the proposed extension is 4.18m.

Monamonra , Errill , Co. Laois

383m
2660400CONDITIONAL24 Jun 2026

revise design to that previously permitted under Planning Ref. No. 25/60507 and will comprise the construction of a single-storey extension (94m²) to the rear/side of the existing bungalow to provide ancillary family accommodation, with a separate entrance and an internal connection to the main dwelling, together with all associated site works. The height of the proposed extension is 4.18m.

Monamonra , Errill , Co. Laois

398m
2660252CONDITIONAL4 May 2026

retain existing outhousing for use as domestic storage including associated siteworks.

Monamonra , Errill , Co. Laois

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?