← Back to search

The Downes , Portlaoise , Co. Laois

N/A

Planning application 2460428

Laois - Laois County Council

Proposed Development

carry out development which will consist of the construction of part two storey and part three storey 1000 pupil secondary school to include general classrooms, specialist classrooms, a general-purpose hall, PE hall, offices, staff room, library, sanitary facilities and ancillary spaces. The development also includes the provision of: • New site entrance from the adjoining Timahoe / Well Road (R426), access road with cycle and foot paths, car and bicycle parking spaces. • Provision of new footpath on the Timahoe / Well Road (R426), connecting to the existing. • 6 no. ball courts, landscaped gardens and external social space. • Provision of a heat pump and gas storage areas, a storage shelter and covered work area and bin storage area. • Provision for all landscaping, boundary treatments, associated drainage, attenuation and other site services with all related site development and ancillary works

View the full application file on the council's planning portal →

Application Details

Location
The Downes , Portlaoise , Co. Laois
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Laois County Council
Site Area
7.47 ha

Timeline

Registration Date
19 July 2024
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2560303CONDITIONAL20 May 2025

construct two storey and part three storey 1000 pupil secondary school to include general classrooms, specialist classrooms, a general-purpose hall, PE hall, offices, staff room, library, sanitary facilities and ancillary spaces. The development also includes the provision of: • New site entrance from O’Dowling roundabout on the Portlaoise South Orbital Route – R94 - Leading to new car and bus set down/ drop off area with 49 No. carparking spaces and with pedestrian & cycle route to the proposed school. • New site entrance from the adjoining Timahoe / Well Road (R426), access road with cycle and foot paths, bicycle spaces and 92 No. car parking space. • Provision of new footpath on the Timahoe / Well Road (R426), connecting to the existing. • Proposed new Hockey pitch with associated fencing, shelter dugouts and 8 no. flood lighting standards. • 6 no. ball courts, landscaped gardens and external social space. • Provision of a heat pump and gas storage areas, external stores and bin storage area. • Provision for all landscaping, boundary treatments, associated drainage, attenuation and other site services with all related site development and ancillary works. • A Natura Impact Statement (NIS) will be submitted to the planning authority with the application and the NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the relevant planning authority.

The Downes , Portlaoise , Co. Laois

234m
2560181CONDITIONAL4 Apr 2025

construct a trade/retail warehouse facility and all ancillary site development works. The proposed development also provides for a sheltered outdoor garden centre display area at ground floor level with ancillary storage areas, office and staff welfare areas at ground and mezzanine floor levels. Ancillary site works include the provision of surface car parking and service areas, rooftop PV panels, fascia signage and bicycle parking facilities. Access to the proposed development will be provided via the internal road network of the Lismard Business Park.

Lismard Business Park , Downs , Portlaoise Co. Laois.

260m
21628CONDITIONAL7 Sept 2021

to retain 1 no. Site Signage on Summerhill Road, and (b) 2 no. Site Signage on New Road, Portlaoise, Co. Laois

Downs , Meelick , Portlaoise

299m
2640N/A10 Jun 2026

Social Sauna & Wellness Courtyard Complex, consisting of office administration block, saunas, plunge pool, cold baths, changing rooms, garden room, toilets, store room, carparking & ancillary site works including signage.

Timahoe Rd , Portlaoise , Co. Laois

299m
2642N/A16 Jun 2026

Construct Social Sauna & Wellness Courtyard Complex, consisting of office administration block, sauna's, plunge pool, cold-baths, changing rooms, garden room, toilets, store room, carparking & ancillary site works including signage

Timahoe Road , Portlaoise , CO Laois

329m
2231CONDITIONAL26 Jan 2022

construct a new recording studio inclusive of offices and a chapel, a new entrance onto Lismard Business Park and all associated site works

Lismard Business Park , Timahoe Road , Portlaoise

359m
18478CONDITIONAL3 Aug 2018

erect a 799.3 sq m single storey Kidney Dialysis Treatment Centre and connected 49.0sq m open service compound area, building and site signage together with 29 no. car parking spaces

Lismard Business Park , Timahoe Raod , Portlaoise

362m
2660254N/A5 May 2026

retain the following A) the demolition of a section of an existing industrial building, B) the erection of a new steel frame structure, C) construction of a concrete wall, D) all associated site works. Planning Permission is sought for A) the completion of the partially constructed industrial shed, B) the replacement of existing cladding on the existing building, C) and all site works necessary to facilitate the development.

Meelick , Portlaoise , Co. Laois

362m
2660293N/A20 May 2026

A) the demolition of a section of an existing industrial building, B) the erection of a new steel frame structure, C) construction of a concrete wall, D) all associated site works. Planning Permission is sought for A) the completion of the partially constructed industrial shed, B) the replacement of existing cladding on the existing building, C) and all site works necessary to facilitate the development.

Meelick , Portlaoise , Co. Laois

362m
2560790N/A27 Nov 2025

demolish a small section of an existing industrial building b) alter the roof design of an existing industrial building which will involve changing the height, profile and pitch of the roof c) changes to the elevations of the building to accommodate this new roof design and d) replacing the existing cladding on the building with new cladding and all associated site works

Meelick , Portlaoise , Co. Laois

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?