← Back to search

Gaelscoil Phortlaoise , Summerhill Downs Portlaoise , Co. Laois

N/A

Planning application 2560510

Laois - Laois County Council

Proposed Development

install sustainable energy compounds to host 2 no. LPG tank and 5 no. modular heat pumps, and all associated site development works

View the full application file on the council's planning portal →

Application Details

Location
Gaelscoil Phortlaoise , Summerhill Downs Portlaoise , Co. Laois
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Laois County Council
Site Area
1.139 ha

Timeline

Registration Date
20 August 2025
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

13m
2560466N/A1 Aug 2025

carry out development which will consist of the installation of sustainable energy compounds to host 2 no. LPG tank and 5 no. modular heat pumps, and all associated site development works

Gaelscoil Phortlaoise , Summerhill Downs Portlaoise , Co. Laois

66m
2560467N/A1 Aug 2025

carry out development which will consist of the installation of a sustainable energy compound to host 6 no. modular heat pumps, and all associated site development works

Portlaoise Educate Together Summerhill Downs , Stradbally Road Portlaoise , Co. Laois

66m
2560477CONDITIONAL8 Aug 2025

carry out development which will consist of the installation of a sustainable energy compound to host 6 no. modular heat pumps, and all associated site development works.

Portlaoise Educate Together Summerhill Downs , Stradbally Road Portlaoise , Co. Laois

66m
2560519CONDITIONAL25 Aug 2025

to install sustainable energy compounds to host 2 no. LPG tank and 5 no. modular heat pumps, and all associated site development works.

Gaelscoil Phortlaoise , Summerhill Downs Portlaoise , Co. Laois

77m
2660256N/A5 May 2026

install of sustainable energy compounds to host an LPG tank and heat pump modules, and all associated site development works.

Maryborough (Church of Ireland) National School , Summerhill Downs , Potlaoise

77m
2660335CONDITIONAL2 Jun 2026

install sustainable energy compounds to host an LPG tank and heat pump modules, and all associated site development works under a Renewable Energy Directive III (RED III) Development.

Maryborough (Church of Ireland) National School , Summerhill Downs , Potlaoise

199m
21853CONDITIONAL10 Dec 2021

amend the number and dwelling mix of the partially constructed scheme as permitted under Laois County Council Reg. Ref. 18/450 as amended by Reg. Refs. 19/217 and 19/690. The scheme as permitted comprises 78 no. units providing 15 no. 4 bedroom units and 63 no. 3 bedroom units. The scheme as proposed comprises 75 no. dwellings providing 21 no. 3 bedroom units and 54 no. 4 bedroom units (including 20 no. constructed units comprising 15 no. 3 bedroom units and 5 no. 4 bedroom units); and all associated works

Aghnaharna , Portlaoise , Co. Laois

202m
19217CONDITIONAL17 Apr 2019

amend house no.53 (134.6 sq m) in the permitted 79 No. unit residential scheme as granted planning permission under Reg. Ref. 18/450 and comprises a single storey extension to the rear of the property measuring 28.1 sq m; amendments to the door and window arrangements on the 4 No. facades; internal changes to the layout of the permitted dwelling; and all associated works

Aghnaharna , Portlaoise , Co. Laois

206m
2560246REFUSED25 Apr 2025

construct a car wash automated unit, a plant room with a water recycling system and all associated site works

Ben Dunne Gym Lismard Business Park , New Road Portlaoise , Co. Laois

206m
2560238N/A23 Apr 2025

carry out development which will consist of the construction of a car wash automated unit, a plant room with a water recycling system and all associated site works

Ben Dunne Gym Lismard Business Park , New Road Portlaoise , Co. Laois

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?