The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

Cappanaboe , Carlow , Co Laois

N/A

Planning application 2660536

Laois - Laois County Council

Proposed Development

construct a dwelling house, domestic garage, new wastewater treatment system, new bored well, new splayed entrance and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Aug 2026

  2. Decision due (upcoming)

    29 Sept 2026

Application Details

Location
Cappanaboe , Carlow , Co Laois
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Laois County Council
Site Area
0.39 ha
Floor Area
273 sq m
Residential Units
1

Timeline

Registration Date
5 August 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
29 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

591m
2633N/A20 May 2026

A single storey dwelling house with front and rear shed dormer windows , a detached single storey garage, new entrance and driveway, the boring of a well, the installation of a septic tank and percolation area and all associated site works.

Sleaty , Slievemargy

906m
2560659CONDITIONAL15 Oct 2025

retain construction of a single storey extension to the rear elevation of existing dwelling and all associated site works.

Harristown , Ballickmoyler , Carlow Co. Laois.

906m
2560310N/A14 Oct 2025

the construction of a single storey extension to the rear elevation of my existing dwelling and all associated site works

Harristown , Ballickmoyler , Carlow

938m
19563REFUSED10 Oct 2019

construct a single storey extension to the rear of existing single storey garage and change use from same to domestic use (1 bed unit), connect to existing on-site services and all associated site works

Sleaty , Carlow , Co. Laois

1.0km
19450N/A6 Aug 2019

construct a waste recycling shed to include a picking line and tipping area, 3 no. bottle recycling banks, a can recycling bank, a waste skip and all associated site works

Cappanboe , Carlow , Co.Laois

1.0km
19511CONDITIONAL12 Sept 2019

construct a waste recycling shed to include a picking line and tipping area and permit 3 no. bottle recycling banks, a can recycling bank, a waste skip and all associated site works. A waste licence is required for this proposed development

Cappanboe , Carlow , Co. Laois

1.1km
22302CONDITIONAL16 May 2022

retain alterations to my existing dwelling to include retaining the construction of a porch to the front elevation, construction of a single storey extension to the side elevation, internal alterations and all associated site works

Rathduff , Carlow , Co. Laois

1.3km
21366CONDITIONAL25 May 2021

construct a dwelling house, domestic garage, wastewater treatment system, percolation area, bored well, new splayed entrance and associated site works

Hollymount , Carlow , Co. Laois

1.3km
18170N/A23 Mar 2018

construct a two-storey dwelling house, domestic garage, proprietary treatment system and associated percolation area, new site entrance, to demolish existing domestic single storey shed, to install new proprietary treatment system and associated percolation area to accommodate existing dwelling house, all ancillary site works and services

Sleaty , Carlow , Co. Laois

1.3km
18178CONDITIONAL26 Mar 2018

construct a two-storey dwelling house, domestic garage, proprietary treatment system and associated percolation area, new site entrance, to demolish existing domestic single storey shed, to install new proprietary treatment system and associated percolation area to accommodate existing dwelling house, all ancillary site works and services

Sleaty , Carlow , Co. Laois

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?