← Back to search

Gowel , Carrick-on-Shannon , Co. Leitrim

N/A

Planning application 2660208

Leitrim - Leitrim County Council

Proposed Development

1. To construct a storey and a half type domestic dwelling. 2. To construct a domestic garage. 3. To construct a new site entrance. 4. To construct a wastewater treatment system to current EPA code of practice and all ancillary works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 Aug 2026

  2. Application withdrawn

    31 Aug 2026

  3. Decision due (upcoming)

    21 Oct 2026

Application Details

Location
Gowel , Carrick-on-Shannon , Co. Leitrim
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Leitrim County Council
Site Area
0.374 ha
Floor Area
250.28 sq m
Residential Units
1

Timeline

Registration Date
27 August 2026
Status
WITHDRAWN
Decision
N/A
Decision Due
21 October 2026
Withdrawn
31 August 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

240m
20162CONDITIONAL30 Sept 2020

to 1. To demolish an existing habitable dwelling 2. To construct a two storey type dwelling with a single storey to the rear 3. Construct a domestic garage 4. To construct a Waste Water Treatment System to current EPA Code of Practice and all ancillary works

Gowel , Carrick on Shannon , Co Leitrim

598m
17175CONDITIONAL25 Sept 2017

(1) retain and complete hardcore area, (2) to retain domestic storage area attached to garage and (3) construct private machinery storage shed to include new entrance from public road and any alterations necessary to the existing site layout including all ancillary works necessary to complete the development in lieu of Permission to construct private machinery storage shed to include new entrance from public road and any alterations necessary to the existing site layout including all ancillary works necessary to complete the development

Kiltoghert Td , Carrick-on-Shannon , Co Leitrim

621m
2153CONDITIONAL19 Mar 2021

carry out the following alterations to existing house. 1/ Extend existing front entrance porch on South East elevation and 2/ Extend existing utility room/bathroom on North East elevation

Gowel Td , Carrick On Shannon , Co Leitrim

673m
2660196N/A11 Aug 2026

To erect a 30-metre-high lattice telecommunications support structure together with antennae, dishes, associated telecommunications equipment and ground-based cabinets, all enclosed by security fencing and to extend the existing farm access track.

Mong , Carrick-on-Shannon , Co. Leitrim

791m
2560041CONDITIONAL5 Mar 2025

existing dwelling house within revised site boundaries from the previously granted.

Kiltoghert , Carrick on Shannon , Co. Leitrim

1.2km
17180CONDITIONAL28 Sept 2017

provide single storey extension to the side of existing dwelling together with associated site works including upgrading the existing foul effluent disposal system

Finisklin TD , Carrick-on-Shannon , Co. Leitrim

1.3km
2123CONDITIONAL10 Feb 2021

of extension to the rear of the existing dwelling house with associated amended rear roof and all ancillary site works

Corlona Td , Effrinagh , Carrick on Shannon

1.4km
2660136CONDITIONAL29 May 2026

1) Demolition of Existing Barn, 2)Construction of Bungalow Dwelling, 3) Effluent Treatment System, 4) Site access & all associated site works

Corlona , Drumsna , Co Leitrim

1.4km
17159CONDITIONAL31 Aug 2017

construct a bell mouth entrance onto public road to facilitate access to forestry plantation together with internal access road and turning head and all associated site works

Kilmaddaroe , Carrick-on-Shannon , Co Leitrim

1.5km
19155CONDITIONAL10 Jul 2019

construct a dwelling house, domestic garage, new entrance onto public road, onsite wastewater treatment system with connections to services and associated site development works

Kiltoghert Td. , Carrick on Shannon , Co Leitrim

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?