Proposed Development
demolition of existing derelict end of terrace cottage, while providing support and weathering to adjoining property's gable wall, together with ancillary site works
View the full application file on the council's planning portal →Application Timeline
Application received
31 Jul 2018
Further information requested
19 Sept 2018
Application withdrawn
27 Mar 2019
Application Details
- Location
- 5 Long Lane , Limerick.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
Timeline
- Registration Date
- 31 July 2018
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 27 March 2019
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a single storey extension to the rear of dwelling; replacement of rear door with window, and changes to roof lights at the second floor from Planning Permission Ref. P13/078 and all associated site works
23 , Sir Harry's Mall , Limerick.
a) the construction of a 3-5 storey building, to include 30 no. apartment units (9 co. studio units, 7 no. 1 bedroom units, 10 no. 2 bedroom units, and 4 no. 3 bedroom units), comprised of 2 no. blocks of development (1 no. 3-5 storey block addressing Mary Street and 1 no. 4-5 storey block addressing Sráid Séamus Ó'Cinneide), to be accessed by a single and central stair and lift core, and including ancillary spaces such as secure storage for 42 no. resident bicycle parking spaces, communal refuse storage area, and resident storage room. b) Site and external works to consist of the removal of existing palisade perimeter fencing, to be replaced with the proposed new building and associated landscaping and public realm improvements, the provision of a new secure resident communal open space on Sráid Séamus Ó'Cinneide, 2 no. car parking spaces for Pigeon Club use accessed from Sráid Séamus Ó'Cinneide, improvement of public realm areas to both Mary Street and Sráid Seamus Ó'Cinneide including the replacement of footpaths, and the provision of 18 no. new visitor bicycle parking spaces on Mary Street, provision of side access to the proposed new building via new pedestrian only lanes accessed from both Mary Street and Sráid Séamus Ó'Cinneide, new public lighting, connection to the existing foul and surface water network, and all other associated site development and landscaping works. c) proposed development to include archaeological excavation works in relation to existing in-situ walls (Sites & Monuments Record LI005-0017148). In accordance with Article 120(1)(b)(i) of the Planning and Development Regulations 2001, as amended, the Local Authority has carried out a screening for environmental impact assessment of the proposal. Having regard to the information specified under Schedule 7A of the Planning and Development Regulations 2001, as amended, and based on an examination of the nature, size and location of the development, it is determined that there is no likelihood of significant effects on the environment arising from the proposed development. Nonetheless, a person may, within 4 weeks beginning on the date of the publication of this notice, apply to An Coimisiún Pleanála, 64, Marlborough Street, Dublin 1, D01 902. Limerick City and County Council has carried out an Appropriate Assessment (AA) Screening Report and it has been determined that a full Appropriate Assessment is not required in respect of this proposed development
48-50 Mary Street , Limerick
part off-license use in the existing retail unti
Unit 4 Abbey River Court , Sheep Street , Limerick
the change of use of portion of ground floor from its original approved use as retail to use as a medical unit (speech therapist) together with associated new signage
Abbey River Court Sheep St. and , Seamus O'Cinneide St./Northern Relief Road , Limerick.
The development, Limerick Navigation and Park Canal 5-year Maintenance Works along the Abbey River and Shannon River Navigation from Quay Lock to Ardnacrusha Tail Race junction and the Park Canal, in the townlands of Rebouge, Rebouge Island, Park, Monamuck, Irishtown, St. Francis Abbey, English Town, King’s Island, Corbally, Monabraher, Co. Limerick., will consist of essential maintenance works along the Shannon Navigation and Park Canal, as outlined in the Construction Environmental Management Plan (CEMP) submitted with the planning application and in accordance with Waterways Ireland’s statutory remit comprising of the following: • Removal from the navigation, along the Abbey River and River Shannon to the Ardnacrusha Tail Race, overhanging branches and infringing trees (including dead trees) that have fallen over more than 60 degrees out into the navigation channel causing a hazard to passing vessels. • Maintenance of overgrown vegetation impacting and overgrowing the water portion of the Park Canal, aquatic weed management as required, and removal of debris and litter. • Maintenance of the south back drain associated with the Park Canal. • Removal of vegetation impacting Park Canal structures and undertaking necessary physical minor repairs to Quay/Limerick Lock Chamber and associated Footbridge, Troy’s/Park Lock Chamber and Park Bridge and associated canal or lock wing and quay walls. The proposed works will involve maintenance to, but not altering the materials or the character of Protected Structures No. 6063 Canal Footbridge at Lock Quay and No. 6064 Canal Quay and Lock Walls at Lock Quay. The vegetation works will involve working within close proximity to or within the curtilage of, but not undertaking any works to, RPS No. 3478 Stone and Brick buildings at Quay Lock, RPS No. 3319 Lock Quay Carriage Arch, RPS No. 6058 O’Dwyers Bridge and RPS No. 3314 Athlunkard Boat Club An Ecological Impact Assessment (EcIA) and Natura Impact Statement (NIS) accompany the planning application
Waterways Ireland Shannon Navigation , Limerick Navigation Abbey River and Shannon River (center point ITM easting 558124 northing 658029) and Park Canal (ITM Eating 559079 Northing 657734) , Limerick City
the change of use of portion of ground floor from its original approved use as retail to use as a gymnasium together with associated new signage
Abbey River Court , Sheep St. and Seamus O'Cinneide St. , Northern Relief Road Limerick.
the construction of a 476m. sq. Plant Platform and Screen on the roof. The works include minor alterations to Operating Theatres 2 & 3. Barrington's Hospital is a protected structure
Bon Secours Hospital Limerick , Barrington's , George's Quay Limerick.
the change of use of existing storage building on Mary Street at to an education and research facility including demolition of existing storage facility 736 sqm and replacement with two storey education and research facility 697 sqm including office space, computer workstations, learning spaces and associated WC and changing facilities, a new entrance to Mary Street and new signage to Mary street. Associated landscape works and improved public access to Fanning’s Castle from Mary Street are proposed with upgrading of existing Mary Street gates and boundary. The proposed building is within the curtilage of the National Monument No. 383 known as Fanning’s Castle and the following protected structures: 21513070
TUS George's Quay Campus , Mary Street , Limerick
change of use of former public house to gourmet burger, take away, signage, mechanical extraction and associated works
Ground Floor , 50 Athlunkard Street , Limerick.
the change of use of former laundry retail shop to fish and chip take away, potato peeling room extension, mechanical extraction and associated works
52 Athlunkard Street , Limerick.
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?