Main Street , Bruff , Co. Limerick

N/A

Planning application 18836

Limerick - Limerick County Council

Proposed Development

replacing an existing corrugated steel roof with natural slate to match the remainder of the existing premises. Retention Permission is also sought for existing shop signage as constructed. This building is a Protected Structure No. 995

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Aug 2018

  2. Further information requested

    11 Oct 2018

  3. Application withdrawn

    23 Apr 2019

Application Details

Location
Main Street , Bruff , Co. Limerick.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council

Timeline

Registration Date
22 August 2018
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
23 April 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

6m
191014CONDITIONAL11 Oct 2019

replacing an existing corrugated steel roof with natural slate to match the remainder of the existing premises and Retention Permission of existing shop signage as constructed. This building is a Protected Structure Ref. No. 995

Main Street , Bruff , Co. Limerick.

26m
191255CONDITIONAL17 Dec 2019

construction of 2 no. dwelling houses consisting of single-storey dwelling adjoining a two storey dormer style dwelling house, connection to public services, entrances and all ancillary site works

Ballycampion , Bruff , Kilmallock Co. Limerick.

94m
2561110CONDITIONAL29 Oct 2025

the construction of a vehicular entrance and dwelling house, connection to mains services together with all associated site works

Bruff ( townland) , Bruff , Co. Limerick

98m
2360157CONDITIONAL20 Mar 2023

alterations to the existing boundary arrangement, including both the field gate to the north, the vehicular entrance to the south and central pedestrian gate. Retention permission is also sought for the enlargement of the front porch, all

NEWTOWN , BRUFF , CO. LIMERICK

104m
18512CONDITIONAL24 May 2018

construction of a maintenance shed on the church grounds to include all ancillary site works

Bruff , Co. Limerick.

106m
23531CONDITIONAL8 Nov 2023

extension to existing surgery comprising of 4no. consultation rooms, staff room, toilet, staff entrance, corridor and ancillary site works

Fairgreen Terrace , Newtown , Bruff

142m
211326CONDITIONAL23 Sept 2021

the erection of dwelling entrance, bored well, waste water treatment system, private domestic storage shed and all associated site works

Bruff , Co. Limerick

143m
26179N/A31 Jul 2026

construction of a dwelling house, to include revisions to the entrance and boundaries previously granted under planning ref. 24/331, new connection to public sewer and all associated site works

Newtown , Bruff , Co. Limerick.

157m
22795N/A20 Jul 2022

an extension to the existing dwelling house, relocate an existing entrance and all associated site works

Newtown , Bruff , Co. Limerick.

157m
24331CONDITIONAL22 Aug 2024

the construction of an extension to an existing dwelling house, relocate an existing entrance and all associated site works

Newtown , Bruff , Co. Limerick.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?