← Back to search

Loghill Woods , Loghill , Co. Limerick

N/A

Planning application 19798

Limerick - Limerick County Council

Proposed Development

construction of a two storey detached dwelling accessed by a driveway from the public road (N69) and served by a wastewater treatment system and polishing filter and all other ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Aug 2019

  2. Application withdrawn

    12 Nov 2019

Application Details

Location
Loghill Woods , Loghill , Co. Limerick.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council
Floor Area
180 sq m
Residential Units
1

Timeline

Registration Date
12 August 2019
Status
WITHDRAWN
Decision
N/A
Withdrawn
12 November 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

712m
2660530CONDITIONAL11 May 2026

construction of a Detached Dwelling on Site No. 1 inclusive of individual access driveway from the public road, individual wastewater treatment system, all connections to local utilities and all ancillary site works. Outline Permission Ref. No. 23/60207

Loughill , Co. Limerick

728m
211368CONDITIONAL30 Sept 2021

(Ref. number of outline permission 17/1152), subsequently amended by planning reference 20/401, for the construction of 11 no. detached dwellings

Loughill , Co. Limerick

732m
20401CONDITIONAL20 May 2020

amendments to Planning Reference 17/1152 which comprised of a) permission for site development works which will consist of vehicular/pedestrian access, internal roads and footpaths, connections to all adjacent utilities including foul sewer, provision of public lighting, boundary treatment, landscaping and all ancillary site works and b) Outline Permission for 9 no. serviced residential sites. The amendments sought include a revision to site boundaries and an increase in the overall density from 9 to 11 no. detached dwellings which will necessitate minor revisions to the overall site layout including the drainage design

Loughill , Co. Limerick

735m
2360207CONDITIONAL10 Apr 2023

the construction of three detached dwellings with individual access driveways from the public road, individual wastewater treatment systems, connections to local utilities and all ancillary site works

Loughill , Limerick , Ireland

736m
171152CONDITIONAL11 Dec 2017

for 9 no. serviced residential sites and permission for site development works which will consist of vehicular/pedestrian access, internal roads and footpaths, connections to all adjacent utilities including foul sewer, provision of public lighting, boundary treatment, landscaping and all ancillary site works

Loughill , Co. Limerick.

744m
2660529CONDITIONAL11 May 2026

construction of a Detached Dwelling on Site No. 2 inclusive of individual access driveway from the public road, individual wastewater treatment system, all connections to local utilities and all ancillary site works. Outline Permission Ref. No. 23/60207

Loughill , Co. Limerick

771m
2660528CONDITIONAL11 May 2026

construction of a Detached Dwelling on Site No. 3 inclusive of individual access driveway from the public road, individual wastewater treatment system, all connections to local utilities and all ancillary site works. Outline Permission Ref. No. 23/60207

Loughill , Co. Limerick

853m
21604CONDITIONAL6 May 2021

construction of single storey extensions to the front and rear of existing dwelling house, domestic garage/store and all ancillary site works

2 Woodlawn , Loughill , Co. Limerick

869m
22544CONDITIONAL17 May 2022

domestic garage and all ancillary works, to rear of bungalow

No. 1 Woodlawn Loughill , Co. Limerick

948m
201436CONDITIONAL23 Dec 2020

construction of a single storey extension to side of existing dwelling house with connection to existing services and all associated site works

Loughill , Foynes , Co. Limerick

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?