← Back to search

The Grove , Bruff , Co. Limerick

N/A

Planning application 201315

Limerick - Limerick County Council

Proposed Development

construction of a dwelling house, access of existing estate road, connection to existing services, extension to existing landscaping/amenity areas, provision of river walk and all ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Dec 2020

  2. Application withdrawn

    10 May 2021

Application Details

Location
The Grove , Bruff , Co. Limerick.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council
Floor Area
130 sq m
Residential Units
1

Timeline

Registration Date
10 December 2020
Status
WITHDRAWN
Decision
N/A
Withdrawn
10 May 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

43m
2360796CONDITIONAL1 Nov 2023

the construction of 5 dwelling houses, access off existing estate road, connection to existing services, extension to existing landscaped/amenity areas, provision of river walk and all ancillary site works

The Grove , Bruff , County Limerick

85m
21600CONDITIONAL6 May 2021

construction of a dwelling house, garage, entrance, connection to public sewer and all associated site works

Chapel Lane , Bruff , Co. Limerick

106m
211161CONDITIONAL13 Aug 2021

construction of a dwelling house, garage, entrance, connection to public sewer and all associated site works

Chapel Lane , Bruff , Limerick

109m
25277CONDITIONAL15 Aug 2025

a change of house design and garage location from those granted under planning ref. 21/1161 and all associated site works

Chapel Lane , Bruff , Co. Limerick.

112m
267007CONDITIONAL20 Jan 2026

construction of a dwelling house, garage, entrance, connection to public sewer and all associated site works. Original Planning Ref. No. 21/1161

Chapel Lane , Bruff , Co. Limerick

117m
2560729CONDITIONAL25 Jul 2025

extension to the rear of the shop/studio unit

No. 90/91 Main Street , Bruff , Co. Limerick

120m
2460586CONDITIONAL14 Jun 2024

a change of use of the existing property from a derelict public house to a one bedroom apartment. Alterations to the first floor one bedroom apartment and the provision of 4 no. single storey, 1 bed residential units to the rear of existing property, including minor alterations, upgrade and repair works, installations of new services and associated site works. Neilan’s is a Protected Structure [RPS No. 1018] and is in an Architectural Conservation Area. ACA16

Neilan's , Main Street , Bruff

137m
258210N/A21 Feb 2025

the construction of 2 no. 3 bedroom semi-detached houses, provision for new vehicular entrance, 2no new car spaces, connection to existing water main and foul sewer and provision for new planting and associated landscape works

Crawford St. , Bruff , Co. Limerick.

139m
2360735CONDITIONAL6 Oct 2023

change of use of existing retail premises to hot food take away facility, alterations to shopfront, new signage and associated site works

Main Street , Bruff , Co. Limerick

151m
18669N/A2 Jul 2018

alterations to existing house and to construct a two-storey extension to house

Ingelnook East , Bruff , Co. Limerick.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?