Bruff & Brackvoan , Bruff , Co. Limerick
N/APlanning application 201358
Limerick - Limerick County Council
Proposed Development
the demolition of unused pump house and unroofed dungstead and construction of unroofed dungstead and agricultural building to include slatted and straw bedded livestock housing along with associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
16 Dec 2020
Further information requested
15 Feb 2021
Application withdrawn
16 Nov 2021
Application Details
- Location
- Bruff & Brackvoan , Bruff , Co. Limerick
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
Timeline
- Registration Date
- 16 December 2020
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 16 November 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the construction of a veterinary clinic, re-use of an existing farm entrance for access, installation of on-site domestic effluent treatment system and underground animal effluent storage tank, the provision of car parking, landscaping and site works. The veterinary clinic will include permission for the provision of clinic/surgery services associated with large and small animals along with equine treatment services, the retail of associated veterinary/animal products together with all ancillary site development works
Brackvoan Stud , Brackvoan , Bruff Co. Limerick
the demolition of existing former dwelling house, construction of a new two storey dwelling house, detached domestic garage, wastewater treatment system, percolation area, new site entrance & associated boundary wall and all ancillary site works
Brackvoan , Athlacca Road , Bruff Co. Limerick
resurfacing of existing pitch and enlarging same. 2 no. full size multi use playing fields, access road, car parking, site entrance and all associated site works
Kirby O'Sullivan Business Park , Kilmallock Road , Bruff Co. Limerick.
the carry out of development comprising the installation of a prefabricated building to carry out pre-school & after-school child care services. The development will include all necessary site/construction works and boundaries, connection to existing piped & cable services, revisions to existing car parking layout and all associated site works
Brackvoan , Bruff , Co. Limerick
construction of a single storey detached building, parking and associated site works for the purpose of recreation and leisure. The proposed development is within the curtilage of a Protected Structure (RPS Ref. No. 1033).
Brackvoan , Bruff , Co. Limerick
the construction of an entrance, dwelling house, garage, domestic waste water treatment system & polishing filter together with all associated site works
Garbally , Bruff , Co. Limerick.
construction of an extension to their dwelling house and all associated site works
Brackvoan , Bruff , Co. Limerick
construction of two storey and single storey extensions to the side and rear of dwelling, alterations and reconstruction of parts of existing dwelling including removal of rear chimney and all associated site works
Inglenook East , Bruff , Co. Limerick
alterations to existing house and to construct a two-storey extension to house
Ingelnook East , Bruff , Co. Limerick.
the development that comprises (i) 74 no. residential units including (a) 9 no. 4 bed detached units; (b) 3 no. 3 bed detached units; (c) 42 no. 3 bed semi-detached units; (d) 6 no. 3 bed terrace units; (e) 6 no. 2 bed terrace units; and (f) 8 no. 3 bed semi-detached Elderly / Senior Living units (ii) significant open space area incorporating children’s playground; (iii) new estate road with access off the R512 incorporating footpath and cyclepath; (iv) new pedestrian crossing on the R512; (v) upgrade to exisitng pedestrian crossing serving the school; (vi) car parking and bicycle stands; and (vii) all associated site works including attenuation tank and surface water outfall to the Morningstar River
Ballygrennan , Bruff , Co. Limerick
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?