← Back to search

Coolrus , Granagh , Co. Limerick

N/A

Planning application 211431

Limerick - Limerick County Council

Proposed Development

development consisting of construction of building for use for motorcycle sales, repair, storage & maintenance and all ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 Oct 2021

  2. Application withdrawn

    6 Dec 2021

Application Details

Location
Coolrus , Granagh , Co. Limerick
Applicant
N/A
Application Type
RETENTION
Planning Authority
Limerick County Council

Timeline

Registration Date
15 October 2021
Status
WITHDRAWN
Decision
N/A
Withdrawn
6 December 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

7m
22937CONDITIONAL29 Aug 2022

the construction of building for use for motorcycle sales, repair, storage & maintenance, and new vehicular entrance and all ancillary works

Coolrus , Granagh , Co. Limerick

631m
201127CONDITIONAL3 Nov 2020

construction of a single storey dwelling with attic space, a domestic garage, entrance and a septic tank

Coolrus , Bruree , Co. Limerick

637m
20464REFUSED5 Jun 2020

construction of a single storey dwelling with attic space, a domestic garage, entrance and a septic tank

Coolrus , Bruree , Co. Limerick

665m
20444CONDITIONAL29 May 2020

the construction of a single storey rear extension to the existing bungalow, conversion of existing attic space to provide two bedrooms and all ancillary site works

Coolrus , Bruree , Co. Limerick

668m
211417CONDITIONAL12 Oct 2021

construction of a new dormer bungalow dwelling house, detached garage, site entrance, driveway, proprietary wastewater treatment system, percolation area, and all associated site works

Coolrus , Bruree , Kilmallock Co. Limerick

733m
2560239REFUSED24 Mar 2025

the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The total proposed gross floor area of the development (including internal plant areas and ancillary structures) will be c. 5,903 sq.m. The development will consist of the following: • Construction of 2 no. primary digesters (with an overall height of c. 9.1m), a pump house (with a gross floor area (GFA) of c. 279.8 sq.m), and 2 no. post digester tanks (with an overall height of c. 9.1m), located in the northeastern section of the site. • Construction of 2 no. prepits (c. 4.8m in height), a pasteurisation buffer tank (c. 4.8m in height), and a pasteurisation unit (with a maximum height of c. 4.2m), located west of the primary digesters, within the northern section of the site. • Construction of a digestate storage tank (c. 11.3 in height) located centrally on site, to the south of the primary and post digester tanks. • Construction of a digestate treatment building and a feedstock reception building (with a height of c. 12m and a GFA of c. 2,797.2 sq.m) with odour abatement system (with a height of c. 11m to odour abatement stack), located in the northwestern section of site. • Construction of combined heat and power (CHP) unit (c. 2.6m in height and c. 5.6m in height to flue, with a GFA of c. 38.53 sq.m), a biogas boiler (c. 2.6m in height and c. 5.6m in height to flue, with a GFA of c. 12.74 sq.m), a backup boiler (c. 2.6m in height), a gas treatment system (c. 4.2m in height), a biomethane compression system (c. 4.2m in height), and a safety flare (c. 11.3m in height), located south of the digestate storage tank, in the south-east section of the site. • Construction of a CO2 liquefactor (with an overall height of c. 10.7m to top of storage vessels), a propane tank compound accommodating 2 no. propane tanks (c. 1.6m in height), and an ESB substation (with a GFA of c. 23.5 sq.m and a height of c. 3.4m), located in the south-eastern section of the site. • Construction of roofed silage clamps (with a GFA of c. 2,424 sq.m and a height of c. 8.7m) and a fuel storage tank (c. 2m in height), located in the western section of the site. • Construction of a two storey office building (with a GFA of c. 327.4 sq.m and a height of c. 11m) within the western section of the site, adjacent to the site entrance. • Alterations to the adjacent local road including a new site entrance and access arrange

Cappanihane , Bruree , Co. Limerick

851m
19125CONDITIONAL14 Feb 2019

a new dwelling house, a waste water treatment system and polishing filter, a site entrance and all associated site works above and below ground

Lisduane , Granagh , Kilmallock Co. Limerick.

1.1km
25116CONDITIONAL11 Apr 2025

a new dwelling house, detached garage, site entrance, wastewater treatment system, percolation area and all associated site works

Cappanihane , Granagh , Co. Limerick.

1.3km
237031CONDITIONAL15 Nov 2023

extension of permission for planning ref. 17/199: involves the provision of an Asphalt Batching Plant including a bunded bitumen storage area (roof), 6 no. hoppers for insertion of raw material, Reclaimed Asphalt Pavement (RAP) system, conveyor belt system and 5 no. bitumen/fuel storage tanks. The proposed development includes the installation of a new Class 1 (full retention) petrol interceptor & the provision of an emissions stack measuring 22.8m in height (12.8 m above original ground level). The proposal is located within an existing operational quarry on a site measuring 0.82 Hectares and will avail of existing site infrastructure. The site will be accessed off the adjacent local road (LP-1545) via the existing quarry road

Ballinleeny , (Coolrus & Kilmore townlands) , Bruree

1.3km
17199CONDITIONAL3 Mar 2017

involves the provision of an Asphalt Batching Plant including a bunded bitumen storage area (roof), 6 no. hoppers for insertion of raw material, Reclaimed Asphalt Pavement (RAP) system, conveyor belt system and 5 no. bitumen/fuel storage tanks. The proposed development includes the installation of a new Class 1 (full retention) petrol interceptor & the provision of an emissions stack measuring 22.8m in height (12.8 m above original ground level). The proposal is located within an existing operational quarry on a site measuring 0.82 Hectares and will avail of existing site infrastructure. The site will be accessed off the adjacent local road (LP-1545) via the existing quarry road

Ballinleeny , (Coolrus & Kilmore townlands) , Bruree Co Limerick

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?