Derryknockane , Rosbrien , Co. Limerick
CONDITIONALPlanning application 22105
Limerick - Limerick County Council
Proposed Development
the construction of a shared entrance, dwelling house, domestic waste water treatment system with polishing filter together with all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
2 Feb 2022
Further information requested
29 Mar 2022
Further information received
27 Apr 2022
Decision: CONDITIONAL
19 May 2022
Decision due
24 May 2022
Grant issued
22 Jun 2022
Application Details
- Location
- Derryknockane , Rosbrien , Co. Limerick.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
- Floor Area
- 255 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 2 February 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 19 May 2022
- Grant Date
- 22 June 2022
- Permission Expires
- 21 June 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the construction of a shared entrance, dwelling house, domestic waste water treatment system with polishing filter together with all associated site works
Derryknockane , Rosbrien , Co. Limerick
the construction of a shared entrance, dwelling house, domestic waste water treatment system with polishing filter together with all associated site works
Derryknockane , Rosbrien , Co. Limerick.
the construction of a shared entrance, dwelling house, domestic waste water treatment system with polishing filter together with all associated site works
Derryknockane , Rosbrien , Co. Limerick
existing extension to rear of dwelling, existing chimney stack to side of dwelling, existing stonework to front of dwelling, existing front boundary wall, piers, wing walls and entrance gate as constructed
Vondaleur House , Derryknockane , Ballyclough Co. Limerick.
the construction of a two storey extension to the main dwelling house which will incorporate a games room and associated facilities, home office, outdoor terrace, car garage and all associated site and incidental works
Derryknockane , Rosbrien , Limerick
a new four bedroom, two storey 334 sq.m. dwelling house to rear of property within existing stone walls of ruinous farm building. The development will also consist of: 1. Restoration of existing stone dwelling (Protected structure, RPS. 6316 of 157 sq.m.) located at the roadside for use as a storage space and gym. 2. New vehicular entrance and gates within stone perimeter wall. 3.A new wastewater treatment system and percolation area. 4. Ancillary, landscape and site works
Derryknockane , Rosbrien , Limerick.
the construction of a slatted agricultural livestock unit and all associated works
Derrybeg , Rosbrien , Limerick
construction of a dwelling house, detached garage, entrance, waste water treatment system, and all associated site works
Ballycummin Road , Derryknockane , Co. Limerick
construction of 2 no. two storey dwellings both with wastewater treatment systems, site entrance, boundary walls, access road and all associated site works
Derrybeg , Rosbrien , Co. Limerick.
the installation of a ground mounted solar photovoltaic plant with an approximate capacity of 2.80 MWp and a grid connection capacity of 2.33 MW ac within a 3.48 hectare site, including the installation and the cable route to the point of connection at Raheen Business Park, Raheen, Limerick. The proposed development will include approximately 5,432 photo-voltaic modules, covering an approximate area of 18,018.70 square metres, installed on a fixed East West mounting structure with an approximate height of 0.8 metres at the lower edge and 3.1 metres at the highest point. The development will also comprise underground direct current and alternating current cabling, including a cable route located beneath the existing internal cycle path within Raheen Business Park, string combiner boxes, inverters, a prefabricated low voltage transformer cabin located within the photovoltaic installation area, earthing and grid synchronisation equipment, perimeter security fencing with wildlife access points, CCTV where required, drainage and all associated civil works. The development will also include a temporary construction compound and set down area, together with the installation of a mobile welfare unit during the construction phase. The grid connection will be made via the existing on site substation within Raheen Business Park. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Raheen Business Park , Raheen , Limerick
Planning a project of your own?