Curraghakimikeen , Doon , Co. Limerick
CONDITIONALPlanning application 221221
Limerick - Limerick County Council
Proposed Development
site location, site layout plan and as constructed dwelling and garage
View the full application file on the council's planning portal →Application Timeline
Application received
18 Nov 2022
Decision: CONDITIONAL
18 Jan 2023
Decision due
21 Jan 2023
Grant issued
21 Feb 2023
Application Details
- Location
- Curraghakimikeen , Doon , Co. Limerick
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Limerick County Council
- Floor Area
- 120 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 18 November 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 18 January 2023
- Grant Date
- 21 February 2023
- Permission Expires
- 20 February 2028
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(1) modify the roof over the extension to the slatted shed granted permission under planning ref. no. 14/1168, (2) construct extension to existing agricultural storage shed, (3) construct new covered dungsted, (4) construct new agricultural machinery shed, (5) fit PV/solar panels to roofs of existing sheds and all ancillary site works
Gannavane , Cappamore , Co. Limerick.
a new domestic dwelling, new garage, wastewater treatment system & polishing filter, entrance and all associated site works
Reenavanna West , Doon , Co. Limerick
the installation of a wastewater treatment system and sand polishing filter
Reenavanna East , Doon , Co. Limerick.
the continued operation of the existing Knockastanna Wind Farm; as permitted under Limerick County Council Planning Register References 01/1385 (An Bord Pleanala Reference PL13.130938), 07/758 (An Bord Pleanala Reference PL13.224401), and 08/7007; for a further period of 15 years following the expiry of its current planning permission. The existing windfarm comprises (i) 4 No. wind turbines and associated turbine foundations and crane hardstandings; (ii) 1 No. site entrance and 2 kilometres of site access tracks; (iii) 1 No. electrical control building with a gross floor area of 66 square metres, electrical equipment enclosure and wastewater treatment system; (iv) underground electrical and communications cabling; and (v) all drainage, signage, and all ancillary site infrastructure. The proposed development does not comprise any modifications to the existing windfarm and there will be no increase in the number or dimensions of the permitted wind turbines. This planning application is accompanied by an Environmental Impact Assessment Report (EIAR) which includes an assessment of the likely impacts of the proposed development, as a whole and in combination with the relevant off-site or secondary developments which will occur as a direct result of the proposed development. This planning application is also accompanied by a Natura Impact Statement (NIS)
Curraghafoil , Co. Limerick
single storey extensions to the rear of dwelling and all associated site works
Hillside House , Lackmore , Cappamore
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?