Proposed Development
the installation of roof-mounted heat pumps and photovoltaic panels, with ancillary site works. The site is located circa 155m from Plassey House (protected structure) and circa 542m from Plassey Mill and Headrace (protected structure). The University of Limerick campus falls within an architectural conservation area
View the full application file on the council's planning portal →Application Timeline
Application received
6 May 2022
Decision: CONDITIONAL
17 Jun 2022
Decision due
30 Jun 2022
Grant issued
21 Jul 2022
Application Details
- Location
- International Business Centre , Block 2 University of Limerick , Dromroe Castletroy Co. Limerick
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
Timeline
- Registration Date
- 6 May 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 17 June 2022
- Grant Date
- 21 July 2022
- Permission Expires
- 20 July 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the conversion of the former garage to a habitable room, for the bedroom and shower room overhead and all associated site works
17 Careysford Avenue , College Court , Castletroy Co. Limerick.
the first floor extension at the side of the house and other associated works
17 Careysford Avenue , College Court , Castletroy Co. Limerick.
the conversion of the former garage to a habitable room, for the bedroom and shower room overhead and all associated site works
17 Careysford Avenue , College Court , Castletroy Co. Limerick.
the construction of a first floor extension to the side of dwelling with additional car parking space and all associated site works
25 Carysford Avenue , College Court , Castletroy Limerick
the construction of a first floor extension to the side of dwelling with additional car parking space and all associated site works
27 Carysford Avenue , College Court , Castletroy Limerick
subdivision of Office Suite 1 on the Ground Floor of the existing building to form 2 no. independent Office Suites
Block 1 International Science Centre , University of Limerick , Castletroy Co. Limerick
change of use from light industrial to office use
Block 1 International Science Centre , University of Limerick , Castletroy Co. Limerick
of change of use of private domestic garage to bedroom and all associated site works
No. 23 College Court Drive , Castletroy , Limerick
the construction of a new single storey extension and ancillary works to the rear of an existing dwelling house
1 Cambridge Close , College Court , Castletroy Limerick
the construction of an external lift to the south of the Foundation Building, University of Limerick, Sreelane, Castletroy, Co. Limerick. The development will consist of a three storey lift enclosure (16.5m2) between the upper plaza level and lower ground floor terrace level with a glazed link to the first floor level of the Foundation Building. The lift enclosure (13.2m high) will be clad in brickwork, concrete spandrel panels and copper roofing to match the existing building. The site is located circa 155m from Plassey House (protected structure) and circa 542m from Plassey Mill and Headrace (protected structure). The University of Limerick campus falls within architectural campus falls within an architectural conservation area
University of Limerick , Castletroy , Co. Limerick.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?