← Back to search

Lickadoon , Ballyneety , Co. Limerick

N/A

Planning application 22622

Limerick - Limerick County Council

Proposed Development

the construction of a new dwelling, modify existing site entrance and install on-site effluent wastewater treatment system. Permission is sought for a change of use of existing dwelling house to use as farm/workshop/storage uses including ancillary home office. Permission is sought for solar PV installation to roof structure of new dwelling and converted farm workshop. Permission is also sought to construct a slatted cattle shed complete with underground effluent storage tanks associated concrete yards and aprons as part of existing farm enterprise and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Jun 2022

  2. Further information requested

    26 Jul 2022

  3. Application withdrawn

    6 Feb 2023

Application Details

Location
Lickadoon , Ballyneety , Co. Limerick
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council
Floor Area
441.38 sq m
Residential Units
1

Timeline

Registration Date
2 June 2022
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
6 February 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

4m
2360161CONDITIONAL20 Mar 2023

the construction of a new dwelling, modify existing site entrance and install on-site effluent waste water treatment system. Permission is sought for a change of use of existing dwelling house to use as farm/workshop/storage uses including ancillary home office. Permission is sought for solar PV installation to roof structure of new dwelling and converted farm workshop including all associated site works

Lickadoon , Ballyneety , Co. Limerick

682m
2460397CONDITIONAL29 Apr 2024

the installation of a new upgraded domestic wastewater treatment system with polishing filter together with all associated siteworks

Macken house Lickadoon , Ballyneety , Co. Limerick

742m
19586CONDITIONAL18 Jun 2019

an extension to the existing school building. The extension shall be used as a disabled accessible WC and shower room ancillary to the use of the school and all associated site works

Knockea N.S. , Ballyneety , Co. Limerick.

937m
171149CONDITIONAL8 Dec 2017

a change of extension design from that previously approved under planning application reference 16/706 together with all associated site works

Toberyquin , Ballyneety , Co. Limerick.

971m
221163CONDITIONAL28 Oct 2022

a change of house type from that previously permitted under governing planning permission reference number 22/172, together with all associated site works. Planning permission is also being sought for the construction of a domestic garage ancillary to the house

Ballynagarde , Ballyneety , Co. Limerick

974m
22172CONDITIONAL16 Feb 2022

the construction of an entrance, dwelling house, domestic waste water treatment system & polishing filter together with all associated site works

Ballinagarde , Ballyneety , Co. Limerick

983m
22529CONDITIONAL13 May 2022

the construction of a single storey sunroom to the side of the existing dwelling

Boherlode , Ballyneety , Co. Limerick

983m
19791CONDITIONAL9 Aug 2019

the construction of dwelling, garage entrance and install on-site effluent treatment system including all associated site development works

Boherload , Ballyneety , Co. Limerick.

992m
191215REFUSED6 Dec 2019

the construction of an entrance, dwelling house, block of 4 stables for use ancillary to the domestic house, domestic waste water treatment system & polishing filter together with all associated site works

Boherload , Ballyneety , Co. Limerick.

993m
181172CONDITIONAL3 Dec 2018

the construction of a shared vehicular entrance, dwelling house, garage, domestic waste water treatment system and all associated site works

Boherload , Ballyneety , Co. Limerick.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?