← Back to search

Adare Manor Hotel and Golf Resort , Adare Manor Adare , Co. Limerick

CONDITIONAL

Planning application 2460189

Limerick - Limerick County Council

Proposed Development

the erection of 10,634.64m2 or 1.27 MWp of photovoltaic panels on lands located southwest of our golf course, with all associates site works at Tizzard Holdings Unlimited Company, Adare Manor Hotel and Golf Course, Co. Limerick, V94 W8WR. The development will comprise of photovoltaic panels with ground mounted frames with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; using all temporary ways, temporary construction compound/set-down area. The development is situated within an Architectural Conservation Area. The Adare Manor House RPS Ref. 809, The Clubhouse RPS Ref. 819 and Estate Walled Gardens RPS Ref 821-823 are Protected Structures, however these records are not affecting the area of the solar panel’s installation. We will submit a Natura Impact Statement (NIS) to the Planning Authority in connection with the application. The NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy, during office hours at the offices of the Planning Authority

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Mar 2024

  2. Further information requested

    26 Apr 2024

  3. Further information received

    5 Jun 2024

  4. Decision due

    30 Jul 2024

  5. Decision: CONDITIONAL

    30 Jul 2024

  6. Grant issued

    2 Sept 2024

Application Details

Location
Adare Manor Hotel and Golf Resort , Adare Manor Adare , Co. Limerick
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council
Site Area
3.76 ha

Timeline

Registration Date
5 March 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
30 July 2024
Grant Date
2 September 2024
Permission Expires
1 September 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

285m
19108CONDITIONAL8 Feb 2019

development which consist of the following that are at variance with the original planning ref. 15/771; (1) flat roof rear extension to kitchen, (2) pitched roof rear extension to playroom, (3) creation of new sun room by closing in approved covered patio with the fitting of fixed glazing screens to western elevation and bi-folding doors southern elevation, (4) repositioning of sun room chimney stack, (5) flue outlet from kitchen on pitched roof to northern elevation, (6) eastern elevational alterations with new window to home office, closing of approved window opening and new window in the place of the approved side door position to utility, (7) 2 no. attic roof lights over playroom and 1 no. additional attic roof light to eastern elevation, (8) redesign of upper portions of all chimney stacks, (9) internal modifications to ground and first floor layouts, (10) relocation of approved garage position, (11) revisions to boundary walls with addition of front railings and (12) revised elevational treatments with all associated site works

Limetree The Demense , Adare Manor , Adare Co. Limerick.

485m
2560977CONDITIONAL26 Sept 2025

the construction of 10 no. detached 2-storey, 3-bedroom Self-Catering Accommodation Lodges; vehicular access via existing gateway on a roadway linking with the N21 Rathkeale Road to include removal of existing gates and provision of new entrance piers and gates; connection to an existing foul pumping station on the Adare Manor wastewater treatment system network; new services pathway linking to existing road network within Adare Manor. The development will also include car parking, ancillary plant, storage areas, signage, public lighting, bin stores, boundary treatment, and all related site development, servicing, landscaping and excavation works. The Adare Manor House RPS Reg. No. 809, Lantern Lodge RPS Reg. No. 810, Demesne Wall RPS Reg. No. 811, Castle Desmond Bridge RPS Reg. No. 812, Dovecot RPS Reg No. 813, Rent House RPS Reg. No. 814, Gateway RPS Reg No. 815, Station Gates RPS Reg No. 816, Station Lodge/Chocolate Boutique RPS Reg. No. 817, Manor Cottage RPS Reg. No. 818, Clubhouse RPS Reg No. 819, Estate Walled Gardens RPS Reg No. 821-823, Dawson’s Lodge RPS Reg No. 824, Gateway RPS Reg No. 825, Ice House RPS Reg No. 827, Boulabally House Reg. No. 828 and New Farm Yard RPS Reg No. 829 are Protected Structures. The planning application is accompanied by a Natura Impact Statement

Graigue Rathkeale Road , Adare , County Limerick

488m
181212CONDITIONAL12 Dec 2018

construction of a single storey office extension to existing facilities building, a new laundry storage and general purpose storage building along with associated canopies, extension of yard, car parking area and all associated site works. The proposed development is within the curtilage of Adare Manor Estate. Adare Manor is a Protected Structure RPS 809

Adare Manor , Adare , Co. Limerick.

507m
24320CONDITIONAL6 Aug 2024

construction of a detached domestic garage with first floor study/office space, change of elevations to dwelling house, construction of an additional chimney stack, conversion of attic space to living accommodation and all ancillary site works

5 The Demesne , Adare Manor , Adare Co. Limerick.

520m
221025CONDITIONAL22 Sept 2022

the construction of a dwelling house, domestic garage, wastewater treatment system, entrance from road and all associated site works

Graigue , Adare , Limerick

525m
22861CONDITIONAL5 Aug 2022

the erection of 226 No. additional Solar Photovoltaic panels on the roof of the existing machinery shed and all associated site works. The proposed development is within the curtilage of Adare Manor Estate. Adare Manor is a protected structure RPS 809

Adare Manor Hotel and Golf Resort , Adare , Co. Limerick

527m
20320CONDITIONAL16 Apr 2020

the erection of 190 Solar Photovoltaic panels on the roof of the existing machinery shed and all associated site works. The proposed development is within the curtilage of Adare Manor Estste. Adare Manor is a protected structure RPS809

Adare Manor , Adare , Co. Limerick

542m
2461276CONDITIONAL19 Dec 2024

the temporary change of use from residential use to office use for a five-year period, together with ancillary works

Graigue Lodge , Rathkeale Road , Adare County Limerick

558m
22880CONDITIONAL11 Aug 2022

the construction of a single storey extension to the existing dwelling, and all ancillary site works

19 The Village , Adare , Co. Limerick

603m
221019CONDITIONAL21 Sept 2022

the construction of a single-storey extension to Station Lodge (also known as Harry Lowe's Cottage) and internal and external alterations to the building to provide a new 'Chocolate Boutique' comprising of commercial kitchen, retail unit and outdoor terrace with seating area; demolition of part of the existing structure (7sq.m.) to the rear of the building; de-commissioning of existing septic-tank and connection of the new development to an existing foul pumping station on the Adare Manor wastewater treatment system network; re-alignment of Adare Manor Estate road network adjacent to Station Lodge; provision of vehicular set-down area; new pedestrian pathway linking to existing pedestrian path network within Adare Manor. The development will also include ancillary plant, storage areas, staff facilities; building signage; and all related site development, servicing, landscaping and excavation works above and below ground. Station Lodge (also known as Harry Lowe's Cottage) is a Protected Structure, RPS Reg. No. 817. The Adare Manor House RPS Reg. No. 809, Station Gates RPS Reg No. 816, Clubhouse RPS Reg No. 819 and Estate Walled Gardens RPS Reg No. 821-823 are Protected Structures. The development is situated within an Architectural Conservation Area

Adare Manor Hotel & Golf Resort , Adare , Co. Limerick

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?