Mr. Binman , Dock Road Ballykeeffe , Limerick

CONDITIONAL

Planning application 2561339

Limerick - Limerick County Council

Proposed Development

RETENTION of:

  1. a)
    The existing warehouse building and adjacent storage tank which represents a building of reduced scale to that previously permitted by 16/642; b) 3 no. ancillary sheds and tent structure
  2. c)
    Construction Office, and Office and WC
  3. d)
    Retention and relocation of 2 no. existing modular office buildings;
  4. e)
    All ancillary hardstanding, roads and parking areas and permission for construction of an ESB substation and all ancillary landscaping and site development works.
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 Dec 2025

  2. Further information requested

    18 Feb 2026

  3. Further information received

    18 Sept 2026

  4. Decision: CONDITIONAL

    13 Oct 2026

  5. Decision due

    15 Oct 2026

Application Details

Location
Mr. Binman , Dock Road Ballykeeffe , Limerick.
Applicant
N/A
Application Type
RETENTION
Planning Authority
Limerick County Council
Site Area
4.6 ha

Timeline

Registration Date
16 December 2025
Status
DECISION MADE
Decision
CONDITIONAL
Decision Date
13 October 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

88m
18551CONDITIONAL1 Jun 2018

an existing 20 metre high telecommunications support structure (full height with antennas 22.45 metres) carrying telecommunications equipment, together with existing equipment container and associated equipment within a fenced compound as previously granted under local authority reference 12/184. The development will continue to form part of meteor Mobile Communications Ltd existing and future telecommunications and broadband network

Tara Oil , Dock Road , Co. Limerick.

107m
191024N/A15 Oct 2019

use of a designated area within the site under leasehold. The designated area will be used for the temporary storage of soil and stone waste (EWC 18 05 04) and bituminous mixtures (EWC 17 03 02) to enable the accumulation of waste on site (approx. 20 tonnes at any one time) before the removal for disposal at a registered waste facility within the region

Balfour Beatty Compound , Dock Road , Limerick.

127m
2660493CONDITIONAL1 May 2026

a new metal garage door to existing building

Paddy Dore Commercials CVRT Test Centre , Dock Road , Limerick

148m
19602CONDITIONAL21 Jun 2019

existing free standing advertising sign

Bunlicky , Dock Road , Limerick.

149m
18953REFUSED28 Sept 2018

existing free-standing advertising sign

Bunlicky , Dock Road , Limerick.

156m
18385N/A20 Apr 2018

the installation of roof mounted solar panels to existing materials recovery facility and all ancillary works

Ballykeefe , Dock Road , Co. Limerick.

169m
19672CONDITIONAL5 Jul 2019

the installation of roof mounted solar panels to existing materials recovery facility and all ancillary works and services

Ballykeefe , Dock Road , Limerick.

195m
2660693CONDITIONAL19 Jun 2026

the change of use of the previously permitted retail warehouse (Planning Permission 02/1288 refers) to current use as a commercial and personal training gym facility, the addition of a glazed porch to the north-eastern elevation, the provision of a first floor, together with all associated incidental and ancillary works

Unit 1 Blackberry Business Park , Dock Road , Limerick

205m
2560732N/A27 Jul 2025

the construction of a ground and first floor extension to the existing office/workshop building at Unit 2, construction of a first floor office area to the existing office building together with all associated incidental and ancillary works

Unit 2 Blackberry Business Park , Dock Road , Limerick

209m
2661092N/A18 Sept 2026

the construction of a ground and first floor extension to the existing office/workshop building at Unit 2, construction of a first floor office area to the existing building together with all associated incidental and ancillary works, and Retention Permission for the change of use of the previously permitted retail warehousing use of the ground floor of Unit 2 to its current use as office space

Unit 2 Blackberry Business Park , Dock Road , Limerick

The submission window has closed

A decision issued on this application, so observations can no longer be made. Anyone who made a submission during the five-week window can appeal to An Coimisiún Pleanála within four weeks of the decision — until Tuesday 10 November 2026 — for a fee of €220.