← Back to search

Glenmore East , Strand , Co. Limerick

N/A

Planning application 2660283

Limerick - Limerick County Council

Proposed Development

the construction of a new dwelling house, detached garage, entrance, driveway, packaged wastewater treatment system with percolation area and all ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Mar 2026

  2. Application withdrawn

    1 May 2026

  3. Decision due

    6 May 2026

Application Details

Location
Glenmore East , Strand , Co. Limerick.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council
Site Area
0.4 ha
Floor Area
177 sq m
Residential Units
1

Timeline

Registration Date
12 March 2026
Status
WITHDRAWN
Decision
N/A
Decision Due
6 May 2026
Withdrawn
1 May 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

88m
21769CONDITIONAL1 Jun 2021

the construction of a dwelling house, domestic garage, domestic wastewater treatment system, entrance and associated site works

Glenmore East , Strand , Co. Limerick

88m
2560139CONDITIONAL19 Feb 2025

the construction of rear & side extensions to existing house, domestic garage and alterations to existing house to consist of removal of existing chimney, removal of existing side extension to North side of house, removal of single window on West elevation and replacement with two windows and to remove Porch to South side of house and replace with same. Proposed new entrance gate and the closing of existing old entrance gates and the installation of new secondary treatment system and soil polishing filter and all associated site works

Lissurland , Strand , Co. Limerick

263m
2460224CONDITIONAL13 Mar 2024

existing mobile home for use during construction period served by existing septic tank which will be decommissioned on completion of proposed dwelling house, and Planning Permission to (a) construct a new single storey dwelling with detached domestic garage, install new mechanical aeration unit and soil polishing filter system, upgrade existing entrance and access with all associated site works, (b) change of use of existing derelict cottage to garden shed/store

Glenmore East , Strand , Co Limerick

368m
21685CONDITIONAL21 May 2021

construction of a bungalow style dwelling, garage, entrance, driveway, waste water treatment system with soil filter and all ancillary site works

Lissurland Strand , Monagea , Newcastle West Co. Limerick.

460m
25107CONDITIONAL8 Apr 2025

demolition of an existing dwelling house and to construct a replacement dwelling house, a detached garage, alterations to the existing site entrance, new wastewater treatment system, percolation area and all associated site works

Glenmore East , Strand , Co. Limerick.

537m
207014CONDITIONAL15 May 2020

Extension of permission for planning ref. 15/132

Strand , Newcastle West

624m
20826CONDITIONAL24 Aug 2020

construction of a slatted animal house complete with underground slatted tanks, construction of a calf house, the demolition of an animal loose house and all associated site works on their lands

Rathcahill East , Strand , Co. Limerick

684m
18138CONDITIONAL19 Feb 2018

the construction of a milking parlour, dairy, cubicle house, slatted tank, straw bedded house and calving pens

Rathcahill East , Strand , Co. Limerick.

831m
2660594N/A27 May 2026

erection of a Domestic Dwelling, entrance gates and piers, bored well & Secondary Treatment System and soil polishing filter and connections to all existing services & associated site works

Glenmore , Strand , Co. Limerick

904m
2689CONDITIONAL7 Apr 2026

the construction of a slatted house, feed passages, slatted tank and concrete aprons

Lissurland , Strand , Co. Limerick.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?