← Back to search

Cloonagh , Drumlish , Co. Longford

N/A

Planning application 2336

Longford - Longford County Council

Proposed Development

of an existing building used for the recycling of waste

View the full application file on the council's planning portal →

Application Details

Location
Cloonagh , Drumlish , Co. Longford
Applicant
N/A
Application Type
RETENTION
Planning Authority
Longford County Council
Site Area
3.583 ha

Timeline

Registration Date
20 February 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2360066CONDITIONAL23 Jun 2023

proposed construction of extensions to the rear and side of existing waste & recycling sheds/buildings (EPA Licence No. W0169-1) and all ancillary works at

Cloonaugh , Drumlish , Co. Longford

1m
2360225CONDITIONAL13 Dec 2023

proposed construction of an underground water storge tank together with the proposed erection of 2 no. overground water storage tanks one of which will be accompanied with a storage container in which pump equipment will be installed all of which are to be used for the storage of water for fire fighting purposes and all ancillary works (EPA Licence No. W0169-1)

Cloonaugh , Drumlish , Co. Longford

176m
22208CONDITIONAL2 Sept 2022

for the proposed construction of a single bay extension to the side of existing garage & engineering shed which was previously granted full planning permission under planning reference number PL06/285 and all ancillary works

Cloonagh , Drumlish , Co Longford

185m
2460058CONDITIONAL28 Mar 2024

proposed demolition of existing cottage type dwelling house together with the proposed construction of a dormer bungalow type dwelling house, detached garage, entrance, boundary fence/wall, suitable onsite treatment system with polishing filter and all ancillary site works

Cloonagh , Drumlish , Co. Longford

285m
2460135CONDITIONAL4 Jul 2024

proposed construction of a four bay single slatted shed extension with underground effluent storage tank to existing four bay single slatted shed with underground effluent storage tank, together with proposed construction of a holding pen and extension to existing crush and all ancillary works

Cloonagh , Drumlish , Co. Longford

329m
2460276REFUSED21 Nov 2024

the proposed construction of a two storey type dwelling house, detached garage, entrance, boundary fence/wall, suitable onsite treatment system with polishing filter and all ancillary site works

Cloonagh , Drumlish , Co. Longford

344m
21185CONDITIONAL16 Jun 2021

to demolish existing dwelling and to construct a bungalow type dwelling, boundary fence, septic tank with percolation area and all ancillary site works

Cloonagh , Drumlish , Co Longford

406m
2460071CONDITIONAL16 Apr 2024

of existing story and a half type dwelling house with detached garage, storage shed and site boundaries as constructed together with also seeking planning permission to upgrade the existing onsite sewerage system to current EPA standards i.e. EPA code of practice 2021, and all ancillary site works

Cloonaugh , Drumlish , Co. Longford

437m
20231CONDITIONAL8 Oct 2020

works to a bungalow type dwelling house to include (A) alterations to elevations and internal layout (B) provision of a single storey extension to the rear of the dwelling house to consist of new entrance corridor, open plan kitchen/dinging/living space, bedroom, en-suite, bathroom and utility space, (C) domestic garage (D) new site entrance location, boundary walls, piers and fencing, proprietary wastewater treatment unit and percolation area and all ancillary site works

Cloonagh , Drumlish , Co Longford

437m
2560166CONDITIONAL7 Aug 2025

proposed construction of single storey extension to the rear of an existing bungalow type dwelling house and all ancillary site works

Cloonagh , Drumlish , Co. Longford

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?