Planning application 237

Longford - Longford County Council

Proposed Development

the development of a total area of 18.6 hectares and comprises of the following: (1) Extraction of rock by blasting means down to a level of 20mOD from an area of approximately 14.2 Hectares. (2) Erection of a concrete batching plant, processing plant, block yard, storage sheds, workshop, office buildings, weighbridge, wheelwash, settlement lagoon and all other associated ancillary facilities at the proposed manufacturing area of approximately 2.1 Hectares. (3) Landscaping consisting of planted Berms surround (1.6 Hectares). (4) Entrance and access road from the public road to the manufacturing area (0.7 Hectares). (5) Landscaping and restoration of the site on completion of extractions. The planning permission is for a 25-year period

View the full application file on the council's planning portal →

Application Details

Location
Rhyne , Killoe , Co Longford
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Longford County Council
Site Area
18.6 ha

Timeline

Registration Date
19 January 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2439CONDITIONAL18 Jul 2024

the development consists of a total area of 18.6 hectares and comprises of the following: (1) Extraction of rock by blasting means down to a level of 20mOD from an area of approximately 14.2 hectares. (2) Erection of a concrete batching plant, processing plant, block yard, storage sheds, workshop, office buildings, weighbridge, wheelwash, settlement lagoon and all other associated ancillary facilities at the proposed manufacturing area of approximately 2.1 hectares. (3) Landscaping consisting of planted berms surround (1.6 hectares). (4) Entrance and access road from the public road to the manufacturing area (0.7 hectares). (5) Landscaping and restoration of the site on completion of extraction. The planning permission is for a 25 year period. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS)

Rhine , Killoe , Co. Longford

411m
2017CONDITIONAL31 Jan 2020

the continuance of (i) extraction of aggregates on an area of 1.431 hectares; (ii) processing/loading of aggregates on an area of 0.233 hectares; (iii) manufacture of ready-mix concrete in existing plant (176m2); (iv) importation and storage of sand for use in concrete manufacturing (0.008 hectares); (v) use of existing weighbridge and wheel wash (154m2)and (vi) existing site entrance and access areas (0.956 hectares), all within 2.661 hectares of the site development authorised under Pl08/529 and all ancillary works

Rhine , Killoe , Co Longford

532m
2224CONDITIONAL11 Feb 2022

to construct a 2 storey type dwelling house with single storey elements, attached carport, new entrance, boundary walls, piers and fencing, new agricultural entrance, bored well, proprietary wastewater treatement unit and percolation area and all ancillary site works

Killeter , Killoe , Co Longford

598m
2388CONDITIONAL1 Jun 2023

re-construct and extend dwelling house and to upgrade existing septic tank with a new sewerage system and a treatment plant, to provide secondary and tertiary treatment, provide new entrance, and all associated works

Aghaboy , Killoe , Co. Longford

664m
17298REFUSED30 Nov 2017

for the proposed Retention of Existing Agricultural Entrance and all ancillary works

Aghaboy , Killoe , Co. Longford.

690m
2560252CONDITIONAL3 Nov 2025

end of waste activities within the footprint of the existing quarry, where some activities include; 1) Acceptance, processing and recovery of in-coming inert waste material arising from construction and demolition activity, comprising concrete, bricks, soil or other such similar material, to become a certified product for reuse in construction related industries 2) The maximum annual intake of incoming waste material shall not exceed of 24,500 tonnes; 3) The processing will include standard crushing and screening using the existing quarry plant; The site infrastructure for the proposed End of Waste activities will be limited to bays comprising storage and processing; 4) All ancillary site development works. The proposed development seeking planning permission will require a 'Waste Facility Permit' for the acceptance and processing of the in-coming waste, which will be sought through a separate application to Longford County Council. The proposed development seeking planning permission will require registration with Environmental Protection Agency for End of Waste recovery under the National End of-Waste Decision EoWN00l/2023 criteria

Rhine , Killoe , Co.Longford

702m
19143CONDITIONAL31 May 2019

Construction of a new two-storey dwelling, adjoining single-storey domestic garage, site entrance, site works and a new effluent treatment system & percolation area

Killeter , Killoe , Co Longford

714m
21334CONDITIONAL3 Dec 2021

the proposed construction of a two storey type dwelling house, detached garage, entrance, boundary fence/wall, suitable sewerage system with polishing filter and all ancillary site works

Killeter , Killoe , Co Longford

760m
20207N/A16 Sept 2020

proposed construction of a two storey type dwelling house, detached garage, entrance, boundary fence/wall, onsite suitable wastewater treatment system with polishing filter area & all ancillary site works

Aghaboy , Killoe , Co. Longford

798m
18101CONDITIONAL17 May 2018

proposed stables, sand arena, new agricultural entrance and ancillary site where it is now proposed to relocate and retain one single entrance to the site, amendments to stables layout and elevations, relocation of sand arena and provision of hard surface area to include bedding/manure storage and all ancillary site works

Aghaboy , Killoe , Co. Longford

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.