Planning application 17371

Louth - Louth County Council

Proposed Development

Retention & Permission for development to consist of proposed single storey dwellinghouse, on-site well, proprietary wastewater treatment system and percolation area. Retention of site development works consisting of extension of existing access lane and associated siteworks. *Significant Further Information submitted 20/09/2017*

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 May 2017

  2. Further information requested

    3 Jul 2017

  3. Further information received

    20 Sept 2017

  4. Application withdrawn

    9 Oct 2017

Application Details

Location
Stifyans , Philipstown , Dunleer
Applicant
N/A
Application Type
RETENTION
Planning Authority
Louth County Council
Site Area
0.48 ha
Floor Area
220 sq m
Residential Units
1

Timeline

Registration Date
17 May 2017
Status
WITHDRAWN
Decision
N/A
Withdrawn
9 October 2017

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
17806CONDITIONAL27 Oct 2017

Permission for development will consist of a proposed one and half storey dwelling house, on-site well, proprietary waste water treatment system and percolation area. Retention of site development works consisting of extension of existing access lane and associated site works.

Stifyans , Philipstown , Dunleer

71m
19649CONDITIONAL12 Aug 2019

Permission for proposed dwelling house, waste water treatment system and percolation area, and all associated works.

Stifyans , Philipstown , Dunleer

172m
19174CONDITIONAL11 Mar 2019

Permission for proposed dwelling house, waste water treatment system and percolation area and all associated works.

Stifyans , Philipstown , Dunleer

218m
21657CONDITIONAL27 May 2021

Permission for development will consist of proposed dwelling house, waste water treatment system and percolation area and all associated works

Stifyans , Philipstown , Dunleer Co. Louth

321m
2360163N/A16 Jun 2023

Planning permission is sought to construct a single storey one-bedroom self-contained apartment, connect to existing on-site sewage treatment unit & percolation area together with all associated siteworks (to be used in conjunction with the existing disability service operating on the site)

Ivy Lodge , Ardlaraghan , Dunleer

324m
24175REFUSED11 Oct 2024

Permission for a dwelling house, waste water treatment system and associated site development works

Ardlaraghan , Dunleer , Co Louth

326m
24174REFUSED11 Oct 2024

Permission for a dwelling house, domestic garage, waste water treatment system and associated site development works

Ardlaraghan , Dunleer , Co Louth

352m
2360209REFUSED11 Jul 2023

Planning permission is sought to construct a single storey one-bedroom self-contained apartment, connect to existing on-site sewage treatment unit & percolation area together with all associated siteworks (to be used in conjunction with the existing disability service operating on the site) **Signifcant Further Information submitted on 07/12/23 seeks permission to decommission the exising wastewater treatment system and install a new wastewater treatment system and percolation area, surface water soakaway and proposed landscaping to site boundaries.**

Ivy Lodge , Ardlaraghan , Dunleer

397m
19904CONDITIONAL31 Oct 2019

Permission to construct a ground floor extension to the side of our dwelling. Permission is also sought for the ancillary site development works

Stifyans Cross , Dunleer , Co Louth

397m
19533CONDITIONAL5 Jul 2019

Permission to increase the capacity of pre-school over and above that granted under planning ref. no. 18740. The additional capacity will be confined to a log cabin to the rear of dwelling and attached to the log cabin previously granted. Permission is also sought for the ancillary site development works.

Stifyans Cross , Dunleer , Co Louth

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.