← Back to search

Drumulagh , Omeath , Co Louth

N/A

Planning application 22328

Louth - Louth County Council

Proposed Development

retention permission for the change of use from dwelling house to a short stay self -catering holiday accommodation

View the full application file on the council's planning portal →

Application Details

Location
Drumulagh , Omeath , Co Louth
Applicant
N/A
Application Type
RETENTION
Planning Authority
Louth County Council
Site Area
0.026 ha

Timeline

Registration Date
22 April 2022Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

106m
21854REFUSED9 Jul 2021

Outline permission sought for one dwelling house, waste water treatment system and all associated site development works

Drummullagh , Omeath , Co Louth

116m
2660622REFUSED10 Sept 2026

Permission for a single storey house, waste water treatment system and all site development works required to facilitate the development

Drummullagh , Omeath , County Louth

121m
21723REFUSED10 Jun 2021

Retention permission & Permission for development that will consist of retention permission for works already carried out including removal of topsoil to facilitate retained entrance and stoned access driveway to proposed house together with alteration of ground levels and landscaping along retained access driveway & permission for a dwelling house wastewater treatment system and associated site development works

Drummullagh , Omeath , Co Louth

214m
2560122CONDITIONAL6 Mar 2025

Permission for the development consisting of internal and external changes to the existing dwelling to include reconfiguration of internal layout, adaption of window openings and proposed new windows, proposed new external façade treatment to include removal of existing arches and yellow brickwork and replacement with grey brickwork and metal cladding, removal of existing profiled roof tiles and replacement with new metal roof with 5 no. roof windows, proposed powder coated metal pergola to the rear of the dwelling, along with proposed new detached domestic garage, sited on previously approved garage location, with external finishes to match the new proposed new finishes to the dwelling, along with proposed grey brickwork pillars to entrance of site and all associated landscaping and site works to facilitate the development.

Waterville House , Drummullagh Omeath , Co.Louth

268m
2560173N/A27 Mar 2025

Retention permission of groundworks to rear garden to include alterations to ground levels and construction of retaining wall, Permission for completion of groundworks to include retaining wall to provide level areas to rear garden of dwelling and all associated site development works.

11 Ard Cullen , Omeath , Co. Louth

288m
20666CONDITIONAL31 Aug 2020

Permission for development to consist of an extension, alterations and all associated site works to existing dwellinghouse. *Significant Further Information received on 15/04/2021 which comprises of a revised design of the rear extension and associated site works*

6 Ardcullen , Omeath , County Louth

338m
23325CONDITIONAL10 Jul 2023

Permission for alterations to existing dormer window to the back of house along with all associated site works

13 Cul Na Rath , Omeath , Co Louth

340m
2660237N/A24 Apr 2026

Permission for an extension to the side of the existing dwelling and all associated site development works

2 Ard Cullen , Omeath , Co. Louth

416m
211039REFUSED19 Aug 2021

Outline permission for development that will consist of one dwelling house, waste water treatment system and all associated site development works

Knocknagoran , Omeath , Co Louth

424m
211097N/A3 Sept 2021

Permission for a replacement two storey dwelling 10 metres east of the former Drummullagh House

Drummullagh House , Omeath , Co Louth

The submission window has closed

Observations on this application closed on Thursday 26 May 2022, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?