Proposed Development
SHD STAGE 3 Application made to An Bord Pleanala - Stage 2 Ref. 21/750 - Permission for 113 residential units (incl.40 no. 3 bed, two storey, 14 no. 2 bed, two storey and 3 apartment blocks with a total of 59 apartments (23 no. 1 bed and 36 no. 2 bed) as well as a caretaker office, bike shelters and bin enclosures and site development works, roads parking & children's play area. Submissions must be made to An Bord Pleanala - see newspaper notice for more information
View the full application file on the council's planning portal →Application Details
- Location
- Muirhevnamore , Dundalk , Co Louth
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Louth County Council
- Site Area
- 2.3 ha
- Floor Area
- 1.1 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 8 September 2022
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
SHD, Stage 2 PP Ref 21/2
*** ,
retention permission for 1 no. prefabricated Kinspan shed (6 x 9m x 5m high) located within existing car park and all associated site development works
Creative Spark , Clontygora Drive Muirhevnamore , Dundalk Co Louth
Permission for an extension to our existing building to include a new fabrication laboratory facility (fab lab), additional office accommodation, a new entrance area with café facility, ancillary accommodation, 45 no. additional car parking spaces and all associated site development works
Creative Spark , Clontygora Drive , Muirhevnamore Dundalk
Permission for development to consist of the erection of a 6.85m high x 2.71m wide monolithic sign with uplighting at the Inner Relief Road entrance to the estate.
Finnabair Industrial Estate , Inner Relief Road , Dundalk
Permission for Development of Finnabair Industrial Estate, Dundalk, Co Louth, A91 PX06. The development will consist of : A new 2.4 high paladin metal security fence, a new 2m high vehicular access sliding security gate and associated site development works. *Significant Further Information received on 19/09/2023 which includes revisions to the location and height of the proposed security fence and gates*
Finnabair Industrial Estate , Dundalk , Co Louth A91 PX06
Retention and Permission: Retention permission for an extension to the rear of the existing domestic garage and an existing attic conversion and permission for an extension to the front of the domestic garage, together with all associated site development works
13 Finnabair Crescent , Muirhevnamore Dundalk , Co. Louth
Retention and Permission: Retention permission for an extension to the rear of the existing domestic garage and permission for an extension to the front of the domestic garage, together with all associated site development works
13 Finnabair Crescent , Muirhevnamore Dundalk , Co. Louth
Permission for a new 2.4m high paladin metal security fence to include pedestrian gated access. A new 2m high vehicular access sliding security gate. 5 new roller shutter doors to the existing industrial building (3 no. on western elevation and 2 no. on the southern elevation) and associated site development works
Finnabair Industrial Estate , Dundalk , Co Louth
Permission for A. The construction of a new material storage building (Area=2020m2, Height = 13.57m). B. Extension of yard to the West of the existing building. C. Removal of existing carpark area and replacement of same with construction of new carpark area to the North East and extension of carpark to the South East of Site. D. Alterations to site landscaping. E. All associated site development works
Finnabair Industrial Estate , Dundalk , Co. Louth
Permission for the erection of a new illuminated sign (5.6m wide x 3.0m high) to the North & West elevations, of a building currently under construction granted under planning ref. no. 2460114 and associated site development works.
Finnabair Industrial Estate , Dundalk , Co. Louth
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.