Proposed Development
Permission to provide community playing fields with associated facilities. This will include the construction of
- 1.a new entrance from public road, non-illuminated signage and front boundary treatment and planting
- 2.extension of footpath from village to proposed development, 3. 2 No. GAA spec playing fields
- 4.A detached single storey clubrooms to provide dressing rooms, kit rooms, kitchen, meeting room/ office, storage rooms, toilets, plant room and referees room and PV solar array atop south facing roof slope
- 5.a new detached single storey machinery shed
- 6.An access walkway with associated 6m high lighting, 7. 4 No. 15m high ball stops nets to playing fields, 8. 9 No. 18m high floodlighting to playing fields, 9.vehicular parking areas, 10. 3 No. 6m high flagpoles, 11. effluent treatment system with percolation area and 12. New landscaping and all Associated site development works
Application Timeline
Application received
3 Jun 2026
Further information requested
17 Jul 2026
Application Details
- Location
- Ballinlough , Knockbridge , Co. louth
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Louth County Council
- Site Area
- 4.67 ha
Timeline
- Registration Date
- 3 June 2026Other applications received that week
- Status
- FURTHER INFORMATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Retention of the construction of an original dwelling house and associate site development works. Permission for a new waste water treatment system and associated site development works.
Knockatavy , Knockbridge , Dundalk
Permission for a dwelling, waste water treatment system with percolation area and associated site development works off new access laneway to existing entrance at public road
Ballinclare , Knockbridge , Dundalk Co Louth
permission for 54 residential units, a pumping station, ESB substation and all associated site works. The residential units will include: 7 no. detached 4 bed houses, 24 no. semi-detached 3 bed houses, 17 no. terraced 3 bed houses, 4 no. terraced 2 bed houses and 2 no. detached 4/5 bed houses
Ballinlough Road , Ballinlough Knockbridge , Dundalk Co Louth
Retention of the conversion of an existing garage to 2 no. bedrooms, one en-suite and relocation of boundaries.
Ballinlough , Knockbridge , Dundalk
Retention permission for the conversion of a garage, fuel store and store to a kitchen and lounge; a single storey extension comprising porch with WC to the north elevation; alterations to the south facade and east gable of the dwelling; and the construction of a seperate garage and two tool sheds
Ballinlough , Knockbridge , Dundalk Co. Louth
Permission to consist of 54 residential units, a pumping station, ESB substation and all associated site works. The residential units will include: 7No. detached 4-bed houses, 24 No. semi-detached 3-bed houses, 17 No. terraced 3-bed houses, 4 No. terraced 2-bed houses and 2 No detached 4/5-bed houses.
The Ballinlough Road , Ballinlough , Knockbridge
Permission for a one story extension to the east of the existing school building, containing a new corridor, 1 No. classroom, 3 No. resource rooms, with ancillary accommodation and all associated site works.
St. Mary's National School , Knockbridge , Dundalk
Permission for a single storey extension to the front of the school to provide a new accessible lobby and associated site works
Knockbridge , Co Louth
Apply for full planning permission for removal of existing boundary wall for a new vehicular entrance to existing dwelling, installation of new EV charging point and associated site development works.
Knockbridge , Dundalk , Louth
Apply for full planning permission for removal of existing boundary wall for a new vehicular entrance to existing dwelling, installation of new EV charging point and associated site development works.
Knockbridge , Dundalk , Louth
The submission window has closed
Observations on this application closed on Tuesday 7 July 2026, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?