Proposed Development
Retention and Permission: Retention permission for a two storey dwelling house with a single storey annexe, a one and a half storey domestic garage, a waste water treatment system and soil polishing filter as constructed, and the permission development will consist of the change of use of the domestic garage to a utility room, toilet, home office and canteen, for 2 storage rooms at first floor level, and for associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
27 Jul 2026
Decision due (upcoming)
20 Sept 2026
Application Details
- Location
- Knockatober , Dunleer , County Louth
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Louth County Council
- Site Area
- 0.583 ha
- Floor Area
- 2.2 sq m
- Residential Units
- 2
Timeline
- Registration Date
- 27 July 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 20 September 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The retention development consists of the retention of a two storey dwellinghouse with single storey annexe, a one and a half storey domestic garage, a waste water treatment system and soil polishing filter as constructed, and the permission development will consist of the change of use of the domestic garage to a utility room, toilet, home office and canteen, for 2 storage rooms at first floor level, and for associated siteworks.
Knockatober , Dunleer , County Louth
Retention and Permission: The retention development consists of the retention of a two storey dwelling house with single storey annexe, a one and a half storey domestic garage, a waste water treatment system and soil polishing filter as constructed, and the permission development will consist of the change of use of the domestic garage to a utility room, toilet, home office and canteen, for 2 storage rooms at first floor level, and for associated site works
Knockatober , Dunleer , County Louth
EXTENSION OF DURATION OF 17/119 - Permission for development to consist of proposed dwelling house, detached domestic garage, roadside entrance, wastewater treatment system and percolation area and all associated site works
Knockatober , Dunleer , Co Louth
Permission for development to consist of proposed dwelling house, detached domestic garage, roadside entrance, wastewater treatment system and percolation area and all associated site works.
Knockatober , Dunleer , Co Louth
Permission sought for dwelling house, wastewater treatment unit and percolation area, detached domestic garage and all associated site works. *Significant Further Information Received on 09/04/2019*
Knockatober , Dunleer , Co Louth
Retention and Permission: Permission for replacement of existing septic tank/soakaway with proprietary waste water treatment system/percolation area together with all associated site works and retention of existing two storey extension to front of dwelling house
Knockatober , Dunleer , Co Louth
Permission/retention for development at Knockatubber, Dunleer. The development will consist/consists of replacement of existing septic tank/soakway with proprietary waste water treatment system /percolation area together with all associated site works and retention of existing two storey extension to front of dwelling.
Knockatubber , Dunleer , Co Louth
Retention permission for a domestic garage/store/games room and for all associated site works.
Knockatober , Dunleer , Co Louth
Permission for works to an existing Above Ground Natural Gas Installation. The development will consist of the replacement of approximately 101m of existing 2.4m high chainlink perimeter fencing and associated access/emergency gates with new 2.4m high green palisade security fencing/gates, and all associated site works.
Knockatober AGI , Knockatober , Co Louth
Permission for an extension and alterations to existing dwelling house and associated site development works
Knockatober , Dunleer , Co Louth
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.