← Back to search

CLEW BAY HOTEL , JAMES STREET , WESTPORT

CONDITIONAL

Planning application 17636

Mayo - Mayo County Council

Proposed Development

ALTERATIONS TO THE ENTRANCES OF THE HOTEL RECEPTION, BAR AND RESTAURANT COMBINED WITH ALTERATIONS TO ADJACENT FACADES, ADJUSTED FACADE SIGNAGE, ADJUSTED LIGHTING, ALTERATIONS TO SHAPE/FINISH OF EXTERNAL TERRACE, TOGETHER WITH ALL ASSOCIATED ANCILLARY SITE WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 Aug 2017

  2. Decision: CONDITIONAL

    29 Sept 2017

  3. Decision due

    2 Oct 2017

  4. Grant issued

    3 Nov 2017

Application Details

Location
CLEW BAY HOTEL , JAMES STREET , WESTPORT
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Mayo County Council

Timeline

Registration Date
8 August 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
29 September 2017
Grant Date
3 November 2017
Permission Expires
2 November 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
22616CONDITIONAL25 Jul 2022

Planning permission for an array of photovoltaic panels on two southwest/carparking facing pitch roof elevations, inclusive of all ancillary site works and services.

James Street , Westport

0m
23549CONDITIONAL25 Sept 2023

New hotel entrance, shop front, ancillary revisions to the hotel facade, together with all ancillary works, lighting and signage

Clew Bay Hotel , James Street , Westport

22m
22688CONDITIONAL15 Aug 2022

CHANGE OF USE FROM AN OFFICE TO A RESIDENTIAL APARTMENT

1 THE OLD MILL , JAMES STREET , WESTPORT

28m
18767CONDITIONAL8 Oct 2018

CHANGE OF USE FROM A RESIDENTIAL APARTMENT APPROVED UNDER P01/77 TO ADDITIONAL ANCILLARY SPACES ASSOCIATED AND RELATED TO THE PHARMACY PREMISES AT GROUND FLOOR BELOW INCLUDING OFFICE, STAFF WELFARE AND STORAGE ACCOMMODATION

JAMES STREET , WESTPORT , CO. MAYO

34m
22626CONDITIONAL28 Jul 2022

CHANGE OF USE FROM PREVIOUS RETAIL USE AT GROUND FLOOR LEVEL ONLY TO A COFFEE SHOP/RESTAURANT AND THE PROVISION OF SIGNAGE TO THE FRONT ELEVATION OF THE BUILDING ALONG WITH ALL ASSOCIATED SERVICES

JAMES STREET , WESTPORT

35m
2416CONDITIONAL24 Jan 2024

retention permission for the change of use of existing premises to Barber shop along with new signage to front elevation

James Street , Westport , Co. Mayo

38m
1764CONDITIONAL10 Feb 2017

SUB DIVIDE EXISTING COMMERCIAL PREMISES INTO A NEW RETAIL OUTLET WITH ALTERATIONS TO FRONT ELEVATION WITH SEPARATE ACCESS, FOR CHANGE OF USE OF PREVIOUS CONVENIENCE DELI TO RESTAURANT TOGETHER WITH ALL ANCILLARY SITE WORKS

JAMES STREET , WESTPORT

38m
23587N/A2 Nov 2023

Section 5 declaration: change of use from bakery shop to a barber shop

Louis Barber Shop , James Street , Westport

39m
2460351REFUSED10 Jun 2024

The development will consist of the demolition of the existing public house and residential building and the construction of a proposed new café restaurant including preparation of hot and cold food, a food and beverage retail outlet with dine-in and takeaway services on the ground floor and a two-bed apartment on the first floor, including new shopfront, proposed new roof lights and clerestory glazing to the rear and all associated lighting, signage, drainage and service connections.

James Street , Westport , Co Mayo

39m
2560142REFUSED14 Mar 2025

The development will consist of the demolition of the existing public house and residential building and the construction of a proposed new café restaurant including preparation of hot and cold food, a food and beverage retail outlet with dine-in and takeaway services on the ground floor and a two-bed apartment on the first floor, including new shopfront, proposed new roof lights and clerestory glazing to the rear and all associated lighting, signage, drainage and service connections.

James Street , Westport , Co Mayo

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?