10 YEAR PERMISSION FOR THE CONSTRUCTION OF AN ENERGY STORAGE FACILITY WITHIN A TOTAL SITE AREA OF UP TO 1.14HA, TO INCLUDE ONE SINGLE STOREY ELECTRICAL SUBSTATION BUILDING AND ELECTRICAL COMPOUND, ELECTRICAL TRANSFORMER/INVERTER STATION MODULES, CONTAINERISED BATTERY STORAGE MODULES ON CONCRETE SUPPORT STRUCTURES, ACCESS TRACKS, ASSOCIATED ELECTRICAL DUCTING, CABLE RACKING AND CABLING, SECURITY FENCING AND CCTV SECURITY MONITORING SYSTEM, LIGHTING PROTECTION POLES, COMMUNICATIONS EQUIPMENT AND ANCILLARY INFRASTRUCTURE

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Jan 2018

  2. Further information requested

    13 Mar 2018

  3. Further information received

    30 Apr 2018

  4. Decision: REFUSED

    27 Sept 2018

  5. Decision due

    2 Oct 2018

  6. Appeal submitted

    24 Oct 2018

  7. Appeal decided: MODIFIED

    7 May 2019

Application Details

Location
CLARE , CLAREMORRIS , CO. MAYO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Mayo County Council

Timeline

Registration Date
18 January 2018
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
27 September 2018
Permission Expires
6 May 2024

An Coimisiún Pleanála Appeal

Appeal Reference
ABP302850-18
Decision
MODIFIED
Submitted
24 October 2018
Decided
7 May 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

176m
22431CONDITIONAL1 Jun 2022

ALTERATIONS TO THE EXISTING DALTON 110 kV SUBSTATION TO INCLUDE; A SINGLE STOREY EXTENSION (APPROXIMATELY 24M2) TO THE WESTERN SIDE OF THE EXISTING CONTROL BUILDING; INSTALLATION OF A NEW 110 kV TUBULAR BUSBAR INCLUDING A NEW 110 kV SECTIONALISER CIRCUIT BREAKER; 2 NO. NEW 14M HIGH MONOPOLE LIGHTNING MASTS; UPGRADING PROTECTION RELAYS; DECOMMISSIONING AND REMOVING THE EXISTING 110 kV BUSBAR STRUCTURE AND ASSOCIATED SITE WORKS. THE DEVELOPMENT WILL OCCUR WHOLLY WITHIN THE EXISTING SUBSTATION COMPOUND

CLARE , CLAREMORRIS

199m
24224CONDITIONAL13 Jun 2024

10 year planning permission for the construction of a Solar PV farm consisting of up to 19,270 solar photovoltaic (PV) panels. The proposed development will include the installation of solar photovoltaic panels on ground mounted frames/support structures, approximately 40 no. inverters, underground cabling and ducting, security fencing, CCTV cameras, use of existing site entrance, internal access tracks, temporary construction compound and an area of hardstanding for an electrical compound. The electrical compound will consist of six modified shipping containers, four of these units will accommodate the transformer stations with LV Switch Gear and ring main unit, the remaining two containers will serve as communication and storage containers. The proposed development includes the above as well as drain reprofiling and settlement pond as part of peatland restoration works, landscaping, bio-diversity enhacement measures and all other associated site excavation, infrastructural and site development works above and below ground. The operational lifespan of the solar PV development will be 35 years. A NIS accompanies the planning application

Clare , Claremorris , Co. Mayo

272m
24446REFUSED18 Oct 2024

The construction of 4 No. detached houses with one common access onto the N60, together with all ancillary site works and services

Ballyhaunis Rd. , Clare (Kilbeg) , Claremorris

272m
2360519REFUSED5 Dec 2023

The construction of a housing development, comprising of 4 No. 4 bed detached dwellings, together with all ancillary site works and services.

Ballyhaunis Road , Clare (Kilbeg) , Claremorris

272m
24192N/A24 May 2024

construction of 4 no. detached houses with one common access onto the N60, together with all ancillary site works and services

Ballyhaunis Road , Clare (Kilbeg) , Claremorris

303m
2560381CONDITIONAL14 Jun 2025

Planning Permission to demolish shed and part of existing dwelling house, renovate existing dwelling house, construct extension, alter elevations, new entrance access and connect to public sewer all as per drawing documentation submitted together with all ancillary site works and services

Clare , Claremorris , Co. Mayo.

322m
2299CONDITIONAL14 Feb 2022

RETENTION OF EXISTING DWELLING HOUSE WITH ATTACHED GARAGE AND SHED ON SITE AS PER DOCUMENTS LODGED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES

CLARE (KILBEG) , CLAREMORRIS

372m
17222CONDITIONAL28 Mar 2017

CONSTRUCT DWELLING HOUSE AND DOMESTIC GARAGE TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES

CLARE , CLAREMORRIS , CO. MAYO

391m
19328CONDITIONAL7 May 2019

Demolish portion of existing storage shed and construct dwelling house, garage and connect to public sewer, all as per drawing documentation submitted with all ancillary site works and services

Clare , Kilbeg , Claremorris

422m
2660392CONDITIONAL19 May 2026

THE DEVELOPMENT CONSISTS OF THE RETENTION OF REVISED SITE BOUNDARIES FOR THE EXISTING HOUSE AND BASEMENT AS GRANTED UNDER P04/3227

Clare , Claremorris , Co Mayo