Proposed Development
DECOMMISSIONING AND REMOVAL OF ELECTRICAL PLANT AND ASSOCIATED STRUCTURES AND THE DEMOLITION OF THE EXISTING FENCE ALONG A PORTION OF THE NORTH EASTERN BOUNDARY OF THE EXISTING SUBSTATION, THE EXTENSION OF THE EXISTING SUBSTATION BY 3970sq m TO ACCOMMODATE c. 30m OF OVER HEAD 110kV CONDUCTOR CONNECTING TO AN EXISTING 110 kV BUSBAR AND ASSOCIATED STRUCTURES c. 16m HIGH, INCORPORATING LIGHTENING PROTECTION MEASURES, 1 NO. 38/110kV BUNDED TRANSFORMER, AND ADDITIONAL 38 kV ELECTRICAL EQUIPMENT SUCH AS ARC SUPPRESSION COIL, CABLE CHAIRS/SEALING ENDS, ETC. ALL ANCILLARY WORKS WITHIN THE SITE INCLUDING THE PROVISION OF ADDITIONAL AREAS OF HARD-STANDING, INTERNAL ACCESS-WAYS, ASSOCIATED DRAINAGE WORKS AND ALL WORKS ASSOCIATED WITH REMOVAL, RELOCATION, REPLACEMENT AND INSTALLATION OF UNDERGROUND CABLES, ELECTRICAL PLANT AND SWITCHGEAR ON THE SITE, AND A 2.6m HIGH PALISADE PERIMETER FENCE WITH A DEDICATED ACCESS GATE
Application Timeline
Application received
23 Apr 2018
Decision: CONDITIONAL
12 Jun 2018
Decision due
17 Jun 2018
Grant issued
17 Jul 2018
Application Details
- Location
- BELLACORICK , BALLINA , CO. MAYO
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Mayo County Council
Timeline
- Registration Date
- 23 April 2018Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 12 June 2018
- Grant Date
- 17 July 2018
- Permission Expires
- 16 July 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
A c.3 MW CAPACITY BATTERY STORAGE FACILITY AND WILL - SUBJECT TO DETAILED DESIGN, COMMERICAL AND TECHNICAL CONSIDERATIONS INCLUDE: 2 NO. BATTERY STORAGE CONTAINERS (UP TO 16.6m X 2.9M X 3.7M HIGH) A SINGLE-STOREY ELECTRICAL CONTROL ROOM (c.77sqm), ANCILLARY ELECTRICAL PLANT INCLUDING 5 NO. TRANSFORMERS, INVERTERS AND OTHER CONTAINERISED PLANT, A c.15.5M HIGH LIGHTNING MAST AND c.18m HIGH SCADA COMMUNICATIONS MAST, c.2.6m HIGH BOUNDARY FENCE AND ACCESS GATE, c.100m LONG ACCESS ROAD CONNECTING WITH THE EXISTING SUBSTATION ACCESS ROAD AND ANCILLARY SITE WORKS INCLUDING THE INSTALLATON OF SITE SERVICES
BELLACORICK , BALLINA , CO. MAYO
change of sue of former residential garda station to community center/tourist hostel. Construction of single storey extension to the side and rear and associated site development works
Bellacorrick , Ballina
Synchronous condenser/flywheel, located within a fenced compound of c.0.85 ha consisting of: machine building to house equipment including the synchronous condenser, flywheel, lube oil skid, air compressor and pumps. Supporting items of plant; cooling equipment, c.6m high modular containers to house electrical and control equipment, 2 auxilliary transformers and electrical plant including external circuit breaker, HV electrical compound with electrical switchgear and main step-up transformer and new c.200m underground cable grid connection to the Bellacorick 110kv substation; diesel generator, fire water tank, underground oil separator and collection pit, services connections including electrical, water and wastewater and constructed wetland connecting ot Owenmore River; 3 office/welfare buildings and 2 spare parts containers. External lighting poles c. 9m, lightning monopole and Scada communications mast,. 4 fire walls around main step up transformer c. 8m high, 2 fire walls either side of auxilliary transformers c. 5m high, 3 firewalls around cooler for main transformer, 8m high. Ancillary site clearance and developemt works including provision of areas of hardstanding, internal access roads, laydown area, car parking and connection to site services networks. The development will be bounded by one c. 3.6m high palisade fence on the east side and one 5m high palisade fence to the south side. Site access will be by means of a new c. 3.6m high palisade gate and a second 3.6m sliding gate accessed from the Shranakilla Road off the N59. Permission sought is for 10 years. NIS submitted with application.
Shranakilla Road , Bellacorick , Co. Mayo
CONTINUE THE USE OF THE EXISTING 36 METRE HIGH, FREE STANDING LATTICE TYPE COMMUNICATIONS STRUCTURE, CARRYING ANTENNAE AND COMMUNICATION DISHES WITHIN AN EXISTING 2.4 METRE HIGH PALISADE FENCE COMPOUND PREVIOUSLY GRANTED TEMPORARY PERMISSION UNDER P11/645 AND PERMISSION TO ATTACH 3 X 2.6M PANEL ANTENNA FOR THIRD PARTY CO-LOCATION AT ESB TELECOMS LTD TELECOMMUNICATION COMPOUND AT BELLACORRICK, BALLINA
BELLACORRICK , BALLINA
construct new dwelling house, construct new domestic garage, construct new effluent treatment system with all associated works, construct new domestic entrance off public road and carry out all required ancillary works on site
Srahnakilly , Bellacorrick , Ballina
DEVELOPMENT WILL CONSIST OF 1 NO. 4.5M X 3.5M X 3M HIGH (14.6SQM) PREFABRICATED GLASS REINFORCED PLASTIC (GRP) ANALYSER KIOSK, 1NO. 3M X 2.5M X 2.3M HIGH (6.8SQM) PREFABRICATED GRP GENERATOR KIOSK AND 1 NO. 3.5M X 3.5M X 3M HIGH (11.3SQM) PREFABRICATED GRP ANALYSER SUPERVISORY KIOSK. THE DEVELOPMETN WILL ALSO INCLUDE THE REPLACEMENT OF THE EXISITNG 2.45M HIGH CHAIN LINK PERIMETER FENCING WITH NEW 2.4M HIGH PALISADE SECURITY FENCING/GATES AND ALL ASSOCIATED SITE WORKS.
MONEYNIERIN , BELLACORICK
Continued temporary use of the existing Western Way Bridge Bypass on the N59 (at the N59/R312 junction). The existing bypass will facilitate turbine component delilveries to the consented Sheskin Wind Farm (Planning Reg. Ref. P19/457). The existing bypass consists of an upgraded access track and a stream crossing. The stream crossing will be removed following the delivery of turbine components to Sheskin Wind Farm. (A NIS has been submitted.)
Moneynierin , Co. Mayo
RETENTION FOR EXISTING 36M TELECOMMUNICATIONS SUPPORT STRUCTURE, WITH 2M HIGH HEADFRAME FIXED TO TOP, GIVING OVERALL HEIGHT OF 38M, CARRYING ASSOCIATED ANTENNA AND LINK DISHES, ASSOCIATED CABIN, CABINETS, SECURITY FENCING AND ACCESS TRACK (PREVIOUS REF NO. P10/888 REFERS)
BELLACORICK , KILSALLAGH , BALLINA
The development will consist of a 114 Megawatt gas fired peaking power plant (which will be capable of running on a mix of natural gas and hydrogen) comprising the ’electricity generating station’. The electricity generating station will comprise of 2 no. open cycle gas turbine (OCGT) generators each consisting of an air intake filter system, exhaust stack (28 metres high), air vent stack, inter cooler system, turbine control room and transformers. In addition the development will include: • Above Ground Installation (AGI) to facilitate connection to the Gas Network, with compound area of 1,600 m²; • 3 no. Gas AGI buildings; • Admin & welfare block; • Electrical Substation with area of 3,800 m²; • 1 no. Substation building; • Electrical building; • 3 no. Secondary fuel storage tanks with volume of 3,600 m³; • Fire Water Storage Tank & Pumphouse; • Sludge Tank & Pump House; • Resurfacing, Repair and Improvement of Existing Site Entrance; • Replacement Bridge; • Gatehouse; • Internal Access Roads; and • Associated Grid Connection Works within the L52925 Public Roadway. The development will include the provision of 12 no. parking spaces, footpaths, landscaping, fencing and all other associated site development plant and equipment and other works including surface water and foul wastewater drainage infrastructure. The development includes for the demolition and removal of a dwelling (112 m²) and associated farmyard barn and outbuildings (94 m², 15 m², 17 m² and 45 m²), all within a total overall application boundary of 4.35 ha. It should be noted in respect of this planning application that permission is sought for a period of 25 years.
Croaghaun West Srahnakilly and Bellacorick townlands , Bellacorick , Co. Mayo
SINGLE STOREY PROCESS BUILDING OF 13.3M HEIGHT; 16 NO. FIN FAN COOLERS OF 6.9M HEIGHT; HYDROGEN STORAGE AREA WITH AREA OF 4650M2; GAS INJECTION COMPOUND WITH AREA OF 1000M2; 2 NO. GAS AGI BUILDINGS, EACH OF 3M HEIGHT; ELECTRICAL SUBSTATION WITH AREA OF 2407.6M2; 2 NO SUBSTATION BUILDINGS, EACH OF 4M HEIGHT; RAW WATER AND FIRE WATER STORAGE TANK WITH VOLUME OF 879.6M3; PUMP HOUSE OF 5M HEIGHT; WATER ABSTRACTION CHAMBER WITH VOLUME OF 2.9M3; RESURFACING, REPAIR AND IMPROVEMENT OF EXISTING SITE ENTRANCE; REPLACEMENT BRIDGE; INTERNAL ACCESS ROADS AND ASSOCIATED GRID CONNECTION WORKS WITHIN THE L52925 PUBLIC ROADWAY. THE DEVELOPMENT WILL INCLUDE THE PROVISION OF 12 NO. PARKING SPACES, FOOTPATHS, LANDSCAPING, FENCING AND ALL OTHER ASSOCIATED SITE DEVELOPMENT PLANT AND EQUIPMENT AND OTHER WORKS INCLUDING SURFACE WATER AND FOUL WASTEWATER DRAINAGE INFRASTRUCTURE WITHIN A TOTAL OVERALL APPLICATION BOUNDARY OF 6.51HA
CROAGHAUN WEST , SRAHNAKILLY , BELLACORRICK