Bellanaboy Bridge Gas Terminal , Bellagally South , Glenamoy

N/A

Planning application 25176

Mayo - Mayo County Council

Proposed Development

Section 5 Declaration: installation of gas processing equipment including two gas ejectors, one motor driven reciprocating gas compressor package, one modular electircal switch room along with auxillary equipment, piping and supporting structures

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 May 2025

  2. Decision due

    4 Jun 2025

Application Details

Location
Bellanaboy Bridge Gas Terminal , Bellagally South , Glenamoy
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Mayo County Council

Timeline

Registration Date
8 May 2025
Status
APPLICATION FINALISED
Decision
N/A
Decision Due
4 June 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

222m
18730CONDITIONAL25 Sept 2018

PROVISION OF GROUND WATER TREATMENT PLANT WITHIN THE TERMINAL FOOTPRINT (TO THE NORTH OF THE WASTE WATER TREATMENT PLANT) WHICH COMPRISES 1 NO. SETTLEMENT TANK, 3 NO. ABOVE GROUND STORAGE TANKS (2 NO. OF WHICH ARE BUNDED), 2 NO. UNDERGROUND STORAGE TANKS, 3 NO. PUMP SUMPS, CONTROL KIOSK AND ASSOCIATED PIPEWORK, MANHOLES, PLANT, MACHINERY AND INTERNAL ACCESS ROAD AND ALL ANCILLARY SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND

BELLANBOY , BELLAGALLY SOUTH , GLENAMOY

299m
22887CONDITIONAL18 Oct 2022

CONSTRUCTION OF A REFRIGERATION UNIT (CLOSED LOOP PROPANE SYSTEM CONNECTED TO THE BBGT GAS PROCESS FACILITIES) ON A CONCRETE SLAB, WITH OVERALL DIMENSIONS OF 36M X 31M. THIS WILL INVOLVE AN EXTENSION OF A TIER OF THE EXISTING PIPERACK AND A STRUCTURAL STEEL DECK WITH DIMENSIONS OF 25M X 15M. THE PROVISION OF A TEMPORARY PARKING AND CONSTRUCTION AREA. (THE PLANNING APPLICATION IS ACCOMPANIED BY A NIS)

BELLAGELLY SOUTH , GLENAMOY , BALLINA

738m
17395CONDITIONAL22 May 2017

REPLACEMENT OF AN EXISTING DOMESTIC SEPTIC TANK AND SOAKPIT WITH A NEW EFFLUENT TREATMENT UNIT, POLISHING FILTER AND ALL OTHER ASSOCIATED AND ANCILLARY DEVELOPMENT WORKS AT EXISTING DWELLING

BALLINABOY , BARNATRA , BALLINA

760m
17482CONDITIONAL23 Jun 2017

REPLACE EXISTING DOMESTIC SEPTIC TANK AND SOAKPIT WITH A NEW EFFLUENT TREATMENT UNIT, POLISHING FILTER, REVISED SITE BOUNDARIES AND ALL OTHER ASSOCIATED AND ANCILLARY DEVELOPMENT AND WORKS AT EXISTING DWELLING

BALLINABOY , BARNATRA , BALLINA

765m
17394CONDITIONAL22 May 2017

REPLACEMENT OF AN EXISTING EFFLUENT TREATMENT SYSTEM WITH A NEW EFFLUENT TREATMENT UNIT AND POLISHING FILTER

BALLINABOY , BARNATRA , BALLINA

1.2km
17303CONDITIONAL27 Apr 2017

REPLACEMENT OF AN EXISTING DOMESTIC SEPTIC TANK AND SOAKPIT WITH A NEW EFFLUENT TREATMENT UNIT, POLISHING FILTER, REVISED SITE BOUNDARIES AND ALL OTHER ASSOCIATED AND ANCILLARY DEVELOPMENT WORKS AT EXISTING DWELLING

BALLINABOY , BARNATRA , BALLINA

1.2km
17304CONDITIONAL27 Apr 2017

REPLACEMENT OF AN EXISTING DOMESTIC SEPTIC TANK AND SOAKPIT WITH A NEW EFFLUENT TREATMENT UNIT, POLISHING FILTER, REVISED SITE BOUNDARIES AND ALL OTHER ASSOCIATED AND ANCILLARY DEVLEOPMENT WORKS

BALLINABOY , BARNATRA , BALLINA

1.3km
17309CONDITIONAL27 Apr 2017

REPLACEMENT OF AN EXISTING EFFLUENT TREATMENT UNIT AND PERCOLATION AREA WITH A NEW EFFLUENT TREATMENT UNIT, POLISHING FILTER AND ALL OTHER ASSOCIATED AND ANCILLARY DEVELOPMENT WORKS AT EXISTING DWELLING

BALLINABOY , BARNATRA , BALLINA

1.3km
17302CONDITIONAL27 Apr 2017

REPLACEMENT OF AN EXISTING DOMESTIC SEPTIC TANK AND SOAKPIT WITH A NEW EFFLUENT TREATMENT UNIT, POLISHING FILTER, REVISED SITE BOUNDARIES AND ALL OTHER ASSOCIATED AND ANCILLARY DEVELOPMENT WORKS

BALLINABOY , BARNATRA , BALLINA

1.4km
17305CONDITIONAL27 Apr 2017

REPLACEMENT OF AN EXISTING DOMESTIC SEPTIC TANK AND SOAKPIT WITH A NEW EFFLUENT TREATMENT UNIT, POLISHING FILTER AND ALL OTHER ASSOCIATED AND ANCILLARY DEVELOPMENT WORKS

BALLINABOY , BARNATRA , BALLINA

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?