← Back to search

Unit 8 (First Floor) , N5 Business Park , Moneen

N/A

Planning application 257

Mayo - Mayo County Council

Proposed Development

Section 5 Declaration: change of use from retail/commercial (shop) to Temporary International Protection

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Jan 2025

  2. Further information requested

    6 Feb 2025

  3. Further information received

    25 Apr 2025

  4. Decision due

    15 May 2025

  5. Appeal submitted

    9 Jun 2025

  6. Appeal decided: MODIFIED

    15 May 2026

Application Details

Location
Unit 8 (First Floor) , N5 Business Park , Moneen
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Mayo County Council

Timeline

Registration Date
13 January 2025
Status
APPLICATION FINALISED
Decision
N/A
Decision Due
15 May 2025
Permission Expires
14 May 2031

An Coimisiún Pleanála Appeal

Appeal Reference
ABP-322709-25
Decision
MODIFIED
Submitted
9 June 2025
Decided
15 May 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
24451N/A23 Oct 2024

Section 5: If the property qualifies for exemption based on its accommodation of individuals under international protection (IP) as per Planning & Development(exempted development) (No.4) Regulations 2022. Notification of intention to avail of Class 20F Exemption.

Unit 8 First Floor , N5 Business Park , Moneen

124m
2560140N/A12 Mar 2025

Permission for development of mixed use (Retail Warehousing & Commercial) scheme at Moneenbradagh, Castlebar, Co. Mayo (adjoining and forming an extension of the existing N5 Business Park). Permission for development is sought for: 1) Block A comprising 7 no. Retail Warehouse units (part two storey, part double height single storey with void and/or mezzanine configuration), comprising c. 8,166 sqm gross floor space, including an Anchor Unit with ancillary Garden Centre area; 2) Block B comprising 5 no. Commercial units (in two storey configuration), comprising 8,918 sqm; 3) Vehicular and pedestrian / cycle access via new junction to the R309 (former N5) Dublin Road, and via connection / integration with the existing N5 Business Park, along with pedestrian / cycle access from the Moneen Road, and associated enabling/accommodation works; and, 4) Associated development and works including drainage, utility and surface water infrastructure, hard and soft landscaping, roads, cycle lanes and footpaths, car and cycle parking, service areas/yards and circulation routes, boundary treatments, public lighting, building mounted and freestanding signage and wayfinding and all other ancillary works above and below ground. for Primbrook Investments Ltd.

Moneenbradagh , Castlebar , Co Mayo

124m
2560148N/A18 Mar 2025

Permission for development of mixed use (Retail Warehousing & Commercial) scheme at Moneenbradagh, Castlebar, Co. Mayo (adjoining and forming an extension of the existing N5 Business Park). Permission for development is sought for: 1) Block A comprising 7 no. Retail Warehouse units (part two storey, part double height single storey with void and/or mezzanine configuration), comprising c. 8,166 sqm gross floor space, including an Anchor Unit with ancillary Garden Centre area; 2) Block B comprising 5 no. Commercial units (in two storey configuration), comprising 8,918 sqm; 3) Vehicular and pedestrian / cycle access via new junction to the R309 (former N5) Dublin Road, and via connection / integration with the existing N5 Business Park, along with pedestrian / cycle access from the Moneen Road, and associated enabling/accommodation works; and, 4) Associated development and works including drainage, utility and surface water infrastructure, hard and soft landscaping, roads, cycle lanes and footpaths, car and cycle parking, service areas/yards and circulation routes, boundary treatments, public lighting, building mounted and freestanding signage and wayfinding and all other ancillary works above and below ground. for Primbrook Investments Ltd.

Moneenbradagh , Castlebar , Co Mayo

124m
2560149CONDITIONAL18 Mar 2025

Permission for development of mixed use (Retail Warehousing & Commercial) scheme at Moneenbradagh, Castlebar, Co. Mayo (adjoining and forming an extension of the existing N5 Business Park). Permission for development is sought for: 1) Block A comprising 7 no. Retail Warehouse units (part two storey, part double height single storey with void and/or mezzanine configuration), comprising c. 8,166 sqm gross floor space, including an Anchor Unit with ancillary Garden Centre area; 2) Block B comprising 5 no. Commercial units (in two storey configuration), comprising 8,918 sqm; 3) Vehicular and pedestrian / cycle access via new junction to the R309 (former N5) Dublin Road, and via connection / integration with the existing N5 Business Park, along with pedestrian / cycle access from the Moneen Road, and associated enabling/accommodation works; and, 4) Associated development and works including drainage, utility and surface water infrastructure, hard and soft landscaping, roads, cycle lanes and footpaths, car and cycle parking, service areas/yards and circulation routes, boundary treatments, public lighting, building mounted and freestanding signage and wayfinding and all other ancillary works above and below ground. for Primbrook Investments Ltd.

Moneenbradagh , Castlebar , Co Mayo

129m
23600CONDITIONAL27 Oct 2023

change of use of existing ground floor premises from retail to offices, together with associated services

Unit 10A N5 Business Park , Moneenbradagh , Castlebar

140m
21642CONDITIONAL16 Jun 2021

CHANGE OF USE TO 'WAREHOUSE WITH ANCILLARY TRADE COUNTERS' (FOR THE SALE OF BUILDING RELATED PRODUCTS PRINCIPALLY TO TRADE) PLUS ANCILLARY OFFICE AND STAFF SPACE. PROPOSED EXTERNAL CHANGES COMPRISE NEW MECHANICAL PLANT ON WEST ELEVATION; A NEW FIRE DOOR IS PROPOSED IN THE SOUTH ELEVATION; AND A NEW DOOR ON THE NORTH ELEVATION OF THE BUILDING AND ALL ANCILLARY WORKS. INTERNAL LAYOUT AMENDMENTS ARE PROPOSED ON THE GROUND FLOOR AND FIRST FLOOR INCLUDING THE INSTALLATION OF TRADE COUNTERS AND A NEW STAIR CASE. INCLUDES ALL ANCILLARY WORKS

UNIT 15b , N5 BUSINESS PARK , MONEEN ROAD

158m
1761CONDITIONAL8 Feb 2017

CHANGE OF USE OF EXISTING INDUSTRIAL STORAGE UNIT TO USE AS A COMMUNITY HALL FOR COMMUNITY/CULTURAL USE

GROUND FLOOR UNIT C , BLOCK 5 , N5 RETAIL BUSINESS PARK

216m
20965CONDITIONAL10 Dec 2020

PROVISION OF AN OFF LICENCE USE AT THE RETAIL UNIT AT DELANEY'S MACE ALONG WITH ALL ASSOCIATED SERVICES

DELANEYS MACE , MONEEN , CASTLEBAR

216m
2360431CONDITIONAL18 Oct 2023

The installation of a new biomass boiler system within a new enclosure also the installation of a new wood chip storage silo all to be located to the rear of the existing Elverys Sports warehouse building together with all associated site works and connection into existing services.

Elverys Sports , Moneenbradagh Moneen Road , Castlebar Co. Mayo

218m
211259CONDITIONAL1 Dec 2021

INSTALLATION OF A GRID CONNECTED PHOTOVOLTAIC PANEL SYSTEM FITTED TO THE ROOF OF THE EXISTING WAREHOUSE/OFFICE BUILDING TOGETHER WITH ALL ASSOCIATED SITE WORKS

MONEENBRADAGH , MONEEN ROAD , CASTLEBAR

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?