← Back to search

3&4 Greenhills Business Park , Bunree Road Abbeyhalfquarter , Ballina

CONDITIONAL

Planning application 2660706

Mayo - Mayo County Council

Proposed Development

The development will consist of the retention of extension of existing retail premises at first floor level.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Sept 2026

  2. Decision: CONDITIONAL

    2 Nov 2026

  3. Decision due

    5 Nov 2026

Application Details

Location
3&4 Greenhills Business Park , Bunree Road Abbeyhalfquarter , Ballina
Applicant
N/A
Application Type
RETENTION
Planning Authority
Mayo County Council
Site Area
0.111 ha

Timeline

Registration Date
5 September 2026Other applications received that week
Status
DECISION MADE
Decision
CONDITIONAL
Decision Date
2 November 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

270m
20683CONDITIONAL21 Sept 2020

CONSTRUCTION OF A TWO STOREY RESIDENTIAL CARE HOME BUILDING PROVIDING FOR 91 NO. SINGLE ENSUITE BEDROOMS, COMMUNAL AREA, KITCHEN, TREATMENT ROOMS, INTERNAL SECURE LANDSCAPED GARDEN, ALL OTHER ASSOCIATED ROOMS AND ENTRANCE SIGNAGE. DEMOLITION OF A 2 NO. DWELLINGHOUSES ON HOWLEY STREET TO ALLOW FOR THE RE-ALIGNMENT OF AN EXISTING INTERNAL ACCESS ROAD AND UPGRADED SITE ENTRANCE ONTO HOWLEY STREET. CONSTRUCTION OF A NEW INTERNAL ACCESS ROAD, CAR AND BICYCLE PARKING , STORM WATER ATTENUATION SYSTEM, CONNECTION TO ALL SERVICES TOGETHER WITH ALL OTHER ASSOCIATED SITE WORKS

HOWLEY STREET , ABBEYHALFQUARTER , BALLINA

331m
201043CONDITIONAL22 Dec 2020

TEMPORARY CHANGING FACILITIES AND ALL ASSOCIATED SITE WORKS

BUNREE ROAD , ABBEYHALFQUARTER , BALLINA

404m
23119CONDITIONAL6 Mar 2023

Change of use of the existing four-storey building on site (previously used as a grain store and boxing gymnasium) to residential use to create one residential unit. The proposed development will also provide for complete refurbishment and upgrade of the existing building, including new gable windows and all associated site development and clearance works, soft and hard landscaping, new vehicular entrance off the Downhill Road and connections to all environmental services

The Old Grain Store , Downhill Road , Knocknalyre

556m
191002CONDITIONAL19 Dec 2019

Construct an extension of 119.23sqm to commercial unit currently under construction, (which was granted permission previously under P16/673) for sorting recyclable materials with a revised site layout, together with all associated site works

Abbeyhalfquarter , IDA Industrial Estate , Bunree

557m
211306CONDITIONAL13 Dec 2021

REVISE SITE BOUNDARIES AND TO RETAIN THE FOLLOWING ALTERATIONS TO THE DEVELOPMENT WHICH WAS PREVIOUSLY GRANTED PERMISSION UNDER P16/673 AND P19/1002, THE ALTERATIONS TO BE RETAINED ARE: RETAIN EXISTING FENCING, RETAIN EXTERNAL STORAGE AREAS, RETAIN MINOR ALTERATIONS TO INTERNAL OFFICE LAYOUT AND ELEVATIONS, RETAIN LANDSCAPING BERM, RETAIN ACCESS BARRIER LOCATION, RETAIN MINOR ALTERATIONS TO PARKING LAYOUT, TOGETHER WITH ALL ASSOCIATED SITE WORKS

IDA INDUSTRIAL ESTATE , BUNREE , BALLINA

567m
19964CONDITIONAL13 Dec 2019

3 HOUSES CONSISTING OF 1 NO. END OF TERRACE 2 STOREY OVER BASEMENT DWELLING (TOTAL FLOOR AREA 177.75SQM/OVERALL HEIGHT 9614MM) AND 2 2 STOREY SEMI-DETACHED HOUSES (TOTAL FLOOR AREA 138.65SQM EACH/OVERALL HEIGHT 9367MM). REMOVE EXISTING SHEDS, CONNECTION TO EXISITNG SERVICES AND ALL ANCILLARY SITE WORKS. THE SITE IS WITHIN THE CURTILAGE OF PROTECTED STRUCTURE NO. 9 AS LISTED IN THE RECORD OF PROTECTED STRUCTURES. (BALLINA & ENVIRONS DEVELOPMENT PLAN 2009-2015)

NALLY STREET/ROPE WALK LANE , BALLINA

578m
20432CONDITIONAL6 Jul 2020

DIVISION OF EXISTING TOWNHOUSE (NO. 2) INTO TWO NUMBER INDIVIDUAL TOWNHOUSES (NO.2 & NO. 2A) ALONG WITH ALTERATIONS TO FRONTAL ELEVATION AND TO INCLUDE ALL ASSOCIATED SITE WORKS

NO. 2 NALLY STREET , BALLINA , CO. MAYO

590m
18701CONDITIONAL12 Sept 2018

CONSTRUCT DWELLING HOUSE, WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER AREA ALONG WITH ANY OTHER ANCILLARY SITE WORKS

KNOCKNALYRE/DOWNHILL , BALLINA , CO. MAYO

593m
2047CONDITIONAL31 Jan 2020

DEMOLISH SINGLE STOREY ANNEX TO REAR OF EXISTING DWELLING HOUSE, CONSTRUCT NEW TWO STOREY EXTENSION AND CARRY OUT ALTERATIONS AND RENOVATIONS TO EXISTING DWELLING HOUSE TOGETHER WITH ALL ASSOCIATED SITE WORKS

15 ARDNAREE , BALLINA , CO. MAYO

594m
21875CONDITIONAL13 Aug 2021

ALTERATION, CONVERSION AND EXTENSION OF EXISTING STABLES TO DWELLING WITH CONNECTION TO PUBLIC SERVICES AND ALL ANCILLARY SITE WORKS

BALLINA HOUSE , CASTLE ROAD , BELLEEK

The submission window has closed

A decision issued on this application, so observations can no longer be made. Anyone who made a submission during the five-week window can appeal to An Coimisiún Pleanála within four weeks of the decision — until Monday 30 November 2026 — for a fee of €220.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?