Planning application 2660888

Mayo - Mayo County Council

Proposed Development

The development will consist of the construction of an ecological education centre comprising four building elements arranged around a central courtyard, as follows: Element A – an administration block incorporating reception, office accommodation, kitchen, dining and ancillary service/support areas; Element B – a two-storey accommodation block comprising a common room, four no. bedrooms and ancillary spaces at ground floor level, and six no. bedrooms and ancillary spaces at first floor level; Element C – a single-storey flat-roofed block comprising three no. workshops; and Element D – a barrel-roofed structure comprising a storage area and canopy providing a covered external walkway. The development will also include the installation of an effluent treatment unit and tertiary treatment system, the upgrading of the existing entrance onto the public road, together with all associated site services, site development and ancillary works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Nov 2026

  2. Decision due (upcoming)

    8 Jan 2027

Application Details

Location
Tarmon , Blacksod , Ballina
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Mayo County Council
Site Area
1.243 ha

Timeline

Registration Date
5 November 2026Other applications received that week
Status
NEW APPLICATION
Decision
N/A
Decision Due
8 January 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

11m
1862CONDITIONAL5 Feb 2018

CONSTRUCT AN ECOLOGICAL EDUCATION CENTRE CONSISTING OF FOUR BUILDING ELEMENTS ENCLOSING A COURTYARD TYPE ARRANGEMENT. ELEMENT A - AN ADMINISTRATION BLOCK COMPRISING RECEPTION, OFFICE SPACE, KITCHEN, DINING AND SERVICE SUPPORT AREAS. ELEMENT B - TWO STOREY ACCOMMODATION BLOCK COMPRISING AT GROUND FLOOR, A COMMON ROOM, FOUR NUMBER BEDROOMS, ANCILLARY SPACES AND AT FIRST FLOOR, SIX NUMBER BEDROOMS AND ANCILLARY SPACES. ELEMENT C - A SINGLE STOREY FLAT ROOF BLOCK COMPRISING THREE NUMBER WORKSHOPS. ELEMENT D - A BARREL ROOFED STRUCTURE COMPRISING STORAGE AREA INCLUDING PREMISSION FOR A CANOPY ELEMENT TO EXTERNAL COVERED WALKWAY. PERMISSION IS ALSO SOUGHT FOR EFFLUENT TREATMENT UNIT AND TERTIARY SYSTEM, UPGRADE OF EXISTING ENTRANCE ONTO PUBLIC ROAD TO INCLUDE ALL OTHER ANCILLARY SITE SERVICES AND DEVELOPMENT WORKS ASSOCIATED WITH THIS PERMISSION

TARMON , BLACKSOD , CO. MAYO

287m
26164CONDITIONAL22 Jul 2026

demolish extensions to rear and side of existing derelict dwelling and fully refurbish/provide energy upgrades to same. Construct new extensions to rear and side including provision of new foul treatment system and soil polishing filter and associated site development works

Termon , Blacksod , Ballina

741m
22508REFUSED22 Jun 2022

CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC SHED, PROPRIETARY SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE WORKS

TERMON , BLACKSOD , BALLINA

741m
2360487CONDITIONAL22 Nov 2023

Construction of a dwelling house, domestic shed, proprietary sewage treatment system and all associated works

Termon , Blacksod , Ballina

817m
221174CONDITIONAL23 Dec 2022

Place 4 no. glamping pods on site, change of use of existing dance hall to include toilet and shower area for glamping pods and sports hire/sale shop, upgrade effluent treatment system on site, construct new entrance on to public road and carry out all required ancillary works on site

Fallmore , Blacksod , Belmullet

820m
211373CONDITIONAL22 Dec 2021

RETAIN EXISTING PUBLIC HOUSE AND ATTACHED DWELLING HOUSE, AND CONSTRUCT NEW EFFLUENT TREATMENT SYSTEM ON SITE

FALLMORE , BLACKSOD , BELMULLET

1.2km
2460028CONDITIONAL30 Jan 2024

permission for 1. An extension to the LHS of an existing house. 2. Carrying out Alterations to the existing house. 3. To build a new car garage. 4. A new sewage treatment plant with raised tricel puraflo modules and a distribution area. 5. all ancillary site works

Tarmon , Blacksod Ballina , Co Mayo.

1.2km
2237CONDITIONAL27 Jan 2022

CONSTRUCTION OF A NEW DETACHED DWELLING HOUSE, DOMESTIC GARAGE, PROPOSED ON SITE EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

TARMON HILL , BLACKSOD , BALLINA

1.2km
21625REFUSED14 Jun 2021

CONSTRUCTION OF A NEW DETACHED DWELLING HOUSE, DOMESTIC GARAGE, PROPOSED ON SITE EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

TARMON HILL , BLACKSOD , CO MAYO

1.4km
20724CONDITIONAL5 Oct 2020

CONSTRUCTION OF A DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

TARMON , BLACKSOD , BALLINA

Affected by this application?

Open for submissions
17days left to make a submission

Observations close on Wednesday 9 December 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.

Check if you have grounds — free

Two questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?