Proposed Development
construction of a two storey dwelling with single storey living and lounge area to the west, open new vehicular entrance to site, wastewater treatment system and percolation area together with all associated site development works
Application Details
- Location
- Mill Road , Mornington , Co. Meath
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Meath County Council
- Site Area
- 0.4046 ha
- Floor Area
- 233 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 7 April 2021Other applications received that week
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
EXTENSION OF DURATION OF 20733 - Permission for the construction of a new cargo warehouse building on the existing quay side storage area and all associated site development works
Tom Roes Point Terminal , Baltray Road , Drogheda Co Louth
The development will consist of permission for a development consisting of cellular vertical storage units for bulk materials, together with associated site development works. *Significant Further Information received 30/11/2018 which advertises, inter alia, that a Natura Impact Statement accompanied the application.*
Tom Roes Point , Baltray Road , Drogheda
The development will consist of permission for a development consisting of cellular vertical storage units for bulk materials, together with associated site development works.
Tom Roes Point , Baltray Road , Drogheda
Permission for the construction of a new cargo warehouse building on the existing quay side storage area and all associated site development works
Tom Roe's Point , Drogheda , Co Louth
Permission for a ten year development on a site comprising the Premier Periclase production facility at Strand Road and Boyne Avenue, Drogheda. Please see Newspaper Ad for full description. This application is includes an EIAR and NIS. The site comprises the main Premier Periclase production facility site, along with an existing wharf to the south of the main site area, and a portion of the public road adjacent to the wharf. The application site is located within the townland of Newtownstalaban. The proposed development comprises the demolition of existing structures on site and the construction of the first phase of a new sustainably powered enterprise campus. The development will consist of the following: Demolition of existing processing and industrial buildings, ancillary structures, and services associated with the Premier Periclase production facility, and associated site clearance and enabling works. The demolition works include the removal of an existing boiler house and store (with a gross floor area (GFA) of 2,827 sq.m), office building (with a GFA of 510 sq.m), security hut and locker room (with a GFA of 339 sq.m), diesel tanks and bund (with a GFA of c. 70 sq.m), oil store (with a GFA of 168 sq.m), 3 no. pump houses (with a GFA of c. 65 sq.m, 50 sq.m and 75 sq.m respectively), bagging plant and elevator building (with a GFA of 616 sq.m), crane shed structure, Periclase shed and old mill house (with an overall GFA of 4,025 sq.m), boiler house (with a GFA of 207 sq.m), slaker area (with a GFA of 398 sq.m), wharf DB building (with a GFA of c. 44 sq.m), lime kiln building (with a GFA of 2,698 sq.m), canteen and toilets (with a GFA of 64 sq.m), DB structure (Pump House 5) (with a GFA of c. 25 sq.m), acid hut (with a GFA of c. 15 sq.m), DB room (DB 1) (with a GFA of c. 118 sq.m), control room building (with a GFA of 327 sq.m), briquette store (with a GFA of 825 sq.m), MHF DB’s (with a GFA of c. 181 sq.m), brick shed (with a GFA of 1,042 sq.m), shaft kiln blower house (with a GFA of 256 sq.m), and NOx analyzer (with a GFA of c. 9 sq.m). The demolition works include the removal of associated chimney stacks, gantries, kilns, silos, and plant, and an existing overhead conveyor structure between the main site area and the wharf to the south of Strand Road, along with associated ancillary sheds and structures on the wharf. The total gross floor area (GFA) of structures to be demolished is c.14,954sq.m including ancillary structures. An existing work
Premier Periclase production facility , Strand Road and Boyne Avenue , Drogheda Co. Louth
Permission for the provision of a first floor extension over existing ground floor area to rear of dwelling with new side windows to be provided and all ancillary site development works
2 Parkwood , Roschoill , Drogheda Co Louth
Permission for the provision of a fist floor extension over existing ground floor area to rear of dwelling and all ancillary site development works
2 Parkwood , Roschoill , Drogheda Co Louth
Permission for construction works which will include works to a protected structure comprising 1. An extension to existing leisure centre together with all associated works. 2. Demolition of existing function rooms, breakfast room, kitchen area and construction of new function room, breakfast room, kitchen and basement together with all associated works. 3. Demolition of existing bar sunroom and construction of new 2 storey extension to original hotel for new restaurant/bar with conference rooms together with all associated works. 4. Remove and reconstruct the existing facade of the reception area and glazed link corridor from the main hotel to the bedroom block together with all associated works. 5. Carry out alterations on ground and first floors of bedroom block to convert existing meeting rooms into 7 no. additional bedrooms including alterations to building elevations with all associated works. 6. Carry out alterations and refurbish dilapidated accommodation in basement, ground and first floor levels of the original hotel including provision of en-suite bedrooms on first floor and all associated works. 7. Relocate existing tennnis courts to the rear of the leisure centre and provide additional car-parking for the hotel with all associated site works.
Boyne Valley Hotel and Country Club , Stameen , Dublin Road Drogheda
EXTENSION OF DURATION OF 17/30 - Permission for construction works which will include works to a protected structure comprising 1. An extension to existing leisure centre together with all associated works. 2. Demolition of existing function rooms, breakfast room, kitchen area and construction of new function room, breakfast room, kitchen and basement together with all associated works. 3. Demolition of existing bar sunroom and construction of new 2 storey extension to original hotel for new restaurant/bar with conference rooms together with all associated works. 4. Remove and reconstruct the existing façade of the reception area and glazed link corridor from the main hotel to the bedroom block together with all associated works. 5. Carry out alterations on ground and first floors of bedroom block to convert existing meeting rooms into 7 no. additional bedrooms including alterations to building elevations with all associated works. 6. Carry out alterations and refurbish dilapidated accommodation in basement, ground and first floor levels of the original hotel including provision of ensuite bedrooms on first floor and all associated works. 7. Relocate existing tennis courts to the rear of the leisure centre and provide additional car-parking for the hotel with all associated site works
Stameen , Dublin Road , Drogheda Co Louth
Permission to erect a garage and utility room to the side, remove an existing conservatory to the rear and extend the kitchen and dining areas over the existing conservatory footprint and all associated site works.
33 Parkwood , Roschoill , Drogheda
The submission window has closed
Observations on this application closed on Tuesday 11 May 2021, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?