Blackberry Cottage , Halltown , Navan Co. Meath C15 HE28
N/APlanning application 221129
Meath - Meath County Council
Proposed Development
planning permission for detached domestic garage to rear of dwelling
View the full application file on the council's planning portal →Application Details
- Location
- Blackberry Cottage , Halltown , Navan Co. Meath C15 HE28
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Meath County Council
- Site Area
- 0.24 ha
Timeline
- Registration Date
- 30 August 2022
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the development will consist of the construction of a single storey extension to the rear of existing dwelling, alterations to windows on the front elevation of existing dwelling, proposed sepcon BAF PE6 treatment system and polishing filter and alterations to the existing site entrance also the demolition of existing garage with all associated site works and landscaping
Halltown , Dunderry , Co Meath C15 HE28
planning permission for detached domestic garage to rear of dwelling
Blackberry Cottage , Halltown , Navan Co. Meath C15 HE28
change of house type, site boundaries and entrance from that previously granted under planning ref: NA/151204 to a two storey dwelling, a detached domestic garage, wastewater disposal system, new site entrance and all associated site works
Ongenstown , Bohermeen , Navan Co. Meath
permission for retention of: 1. Existing agricultural store (Approx. 339m 2). 2. Existing vehicular entrance. Together with permission for: 1. Alterations to the existing vehicular entrance including setting back of the existing hedgerow to improve visibility sightlines. 2. A new 960m 2 agricultural store. 3. Provision of new surface water soakaways. Together with all associated site development works
Halltown , Dunderry , Co. Meath
the development consists of permission to install a new wastewater treatment system and percolation area, increase to soakaway, permission for retention of relocated shed 8 and retention of extension to same, retention of shed 9 and retention and completion of building 10 consisting of storage and farm office at ground floor level with farm hand accommodation at first floor level and all associated site development works. Significant further information/revised plans submitted on this application
Halltown , Dunderry , Co. Meath
retention of; (1) existing agricultural store (approx. 339m2), (2) existing vehicular entrance together with permission for; (1) alterations to the existing vehicular entrance, (2) a new 960m2 agricultural store, (3) provision of new surface water soakaway, together with all associated site development works
Halltown , Dunderry , Co Meath
the development will consist of a new two-storey style dwelling with a single storey projection to the rear & side, detached single storey domestic garage, renovation of existing derelict cottage to home office and home gym, domestic wastewater disposal system, new domestic site entrance and upgrade to existing agricultural site entrance along with all associated site works
Churchtown , Dunderry , Co. Meath
permission to construct domestic garage, one and a half storey dwelling house, secondary waste water treatment unit and percolation area, and all associated site works
Ongenstown , Navan , Co. Meath
the development will consist of single storey dwelling, detached domestic garage, proprietary waste water treatment system and polishing filter, entrance, driveway and all associated site works. Significant further information/revised plans submitted on this application
Churchtown , Dunderry , Co. Meath
extensions and alterations to existing dwelling house
Churchtown , Dunderry , Co. Meath C15 H72Y
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?