Silverstream Priory , Stamullen , County Meath

N/A

Planning application 2660253

Meath - Meath County Council

Proposed Development

the development will consist of: The provision of a new solar panel array to the West of the existing priory

View the full application file on the council's planning portal →

Application Details

Location
Silverstream Priory , Stamullen , County Meath
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Meath County Council
Site Area
6.338 ha

Timeline

Registration Date
4 March 2026
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2660420N/A16 Apr 2026

the development will consist of: The provision of renewable energy consisting of a new solar panel array to the west of the existing priory. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Silverstream Priory Balloy , Stamullen , County Meath

0m
2660282N/A11 Mar 2026

the development will consist of: The provision of a new solar panel array to the West of the existing priory

Silverstream Priory Balloy , Stamullen , County Meath

0m
2660325N/A20 Mar 2026

the development will consist of: The provision of a new solar panel array to the West of the existing priory

Silverstream Priory Balloy , Stamullen , County Meath

25m
AA190766CONDITIONAL13 Jun 2019

an increase in size of the previously approved wastewater treatment system & percolation area granted under Planning Permission Reg. Ref. AA/161308, from a 28 PE to 77 PE certified system to allow for any future expansion of the Priory

Silverstream Priory , Balloy Stamullen , Co. Meath

35m
AA171021CONDITIONAL4 Sept 2017

change of use of the disused chapel at Silverstream Priory to be developed into living accommodation for the use of residence of the Priory. The development will include the conversion of an existing door on the west elevation into a window

Silverstream Priory , Balloy Stamullen , Co. Meath K32 T189

80m
2360179CONDITIONAL22 Jul 2023

a new single storey side extension to existing single storey dwelling house including internal alterations, new wastewater treatment plant and raised polishing filter, elevational changes consisting of new roof windows to existing roof and all associated site works. Significant further information/revised plans submitted on this application

Balloy & Lisdornan , Stamullen , Co. Meath

122m
AA180399CONDITIONAL25 Apr 2018

modification to the previously granted planning application (Reg. Ref. AA/161308) to include: demolition of existing cow sheds and provision of new single storey Oratory. The application includes for an increase in area of the Oratory from 237m2 to 410m2 and increase in height from 6.7m to 8.6m. Alterations to all external elevations. Minor internal alterations to existing courtyard building. Conversion of existing bedroom on first floor level of existing courtyard building to gallery space overlooking Oratory. Additional dormer window to be removed from the courtyard building. New external shelter canopy at front entrance. The new Oratory is to be served by the previously approved sewage treatment system (Reg. Ref. AA/161308)

Silverstream Priory , Benedictine Monks of Perptual Adoration , Balloy Stamullen Co. Meath

145m
21756CONDITIONAL21 Apr 2021

permission for amendments to a previously granted Solar Farm Development (planning permission ref. no. AA160519) for a solar development at Kilbreckstown, Stamullen, Co. Meath. The permitted development consists of: ground mounted fixed solar panel arrays, with a height of 2.5m above ground level one ESB Networks electrical substation three electrical transformers with a height of 2.7m; and access roads and other ancillary equipment required for the development. The amendments are: an increase of export capacity from 4MW to 5MW, a change in the substation dimensions from a maximum height of 4.0m to a height of 4.85m and an increase in the building footprint from 53m2 to 55m2

Kilbreckstown , Stamullen , Co. Meath

193m
AA201650UNCONDITIONAL9 Nov 2020

EXTENSION OF DURATION OF PLANNING PERMISSION AA160519 - A solar PV energy development of maximum export capacity 4MW, to include one ESB networks substation building with a height of up to 4m, three electrical transformer stations with a height of up to 3.2m, site access roads and solar PV panels mounted on steel support structures 2.5m in height, other ancillary equipment and associated cabling, ducting, fencing and CCTV

Kilbreckstown , Stamullen , Co. Meath

363m
2561160N/A29 Oct 2025

the development will consist of: 1) Construction of 1no. two-storey dwelling. 2) New vehicular site entrance to public road. 3) New wastewater treatment system & soil polishing filter, private well, and all associated site works

Silverstream , Balloy , Stamullen Co. Meath

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.