← Back to search

Mayo Road , Gibbstown Navan , Co. Meath

N/A

Planning application 2660903

Meath - Meath County Council

Proposed Development

the development will consist of a new proposed two-storey dwelling with associated car port and garage, the demolition of the existing shed, the opening of a new vehicular entrance to the site and the repositioning of the existing agricultural entrance and new wastewater treatment system and coco filter together with all associated site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Jul 2026

  2. Decision due (upcoming)

    11 Sept 2026

Application Details

Location
Mayo Road , Gibbstown Navan , Co. Meath
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Meath County Council
Site Area
0.26 ha
Floor Area
266.5 sq m
Residential Units
1

Timeline

Registration Date
18 July 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
11 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

254m
KA201847CONDITIONAL3 Dec 2020

a proposed bungalow, waste water treatment system and percolation area, connection to existing mains water supply, shared enrtrance onto public roadway and all ancillaries

Mayo Road , Gibbstown , Navan Co. Meath

265m
268CONDITIONAL13 Jan 2026

File Ref: KA201847 - Bungalow, water treatment system & percolcation area

Mayo Road , Gibbstown , Navan

306m
25211CONDITIONAL31 Oct 2025

REF KA201846 - Proposed storey and a half style dwellinghouse, waste water system and percolation area, connection to mains water and shared entrance onto public road

Mayo Road , Gibbstown , Navan Co. Meath

309m
KA201846CONDITIONAL3 Dec 2020

a proposed storey and a half style dwellinghouse, waste water treatment system and percolation area, connection to existing mains water supply, shared entrance onto public roadway and all ancillaries

Mayo Road , Gibbstown , Navan Co. Meath

394m
212155CONDITIONAL11 Nov 2021

the demolition of existing single storey dwelling, construction of new storey and a half dwelling with use of existing entrance, provision of new septic tank and percolation area, decommissioning of existing septic tank and all associated site works

Mayo Road , Gibbstown , Navan Co. Meath

442m
KA202041CONDITIONAL22 Dec 2020

development will consist of the Construction of a Single Storey dwelling, Domestic Garage, Proprietary Wastewater Treatment System and Polishing Filter, Domestic Entrance, including all Associated site works

Mayo Road , Gibbstown , Navan

461m
KA200026UNCONDITIONAL10 Jan 2020

EXTENSION OF DURATION OF PLANNING PERMISSION KA141013 - The provision of a proprietary waste water system & polishing filter

Gibstown Demesne , Navan , Co. Meath

506m
211707CONDITIONAL2 Sept 2021

a new proposed dwelling and garage, opening of a new vehicular entrance to site and wastewater treatment system and polishing filter together with all associated site development works. Significant further information/revised plans submitted on this application

Mayo Road , Gibbstown , Navan Co. Meath

507m
22406CONDITIONAL1 Apr 2022

permission consequent on the grant of outline permission (ref. no. 21/1707) for development at this site at Mayo Road, Gibbstown, Navan, Co. Meath. The development will consist of a new storey and a half dwelling with single storey living area to the west, associated detached single car garage, opening of a new vehicular entrance to site and wastewater treatment system and polishing filter together with all associated site development works

Mayo Road , Gibbstown , Navan Co. Meath

628m
211788REFUSED14 Sept 2021

the construction of a single storey dwelling, domestic garage, septic tank and percolation area, domestic entrance, including all associated site works. Significant further information/revised plans submitted on this application

Mayo Road , Gibstown Demesne , Navan Co. Meath

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?