← Back to search

Knock , Castletown , Meath

N/A

Planning application KA191705

Meath - Meath County Council

Proposed Development

proposed dwelling house, wastewater treatment system and soil polishing filter, retention permission for existing vehicular entrance, retention permission for temporary use of static mobile home on the site and all associated site development works.

View the full application file on the council's planning portal →

Application Details

Location
Knock , Castletown , Meath
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Meath County Council
Site Area
0.4192 ha
Floor Area
119.88 sq m
Residential Units
3

Timeline

Registration Date
16 December 2019
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

37m
KA190564REFUSED8 May 2019

1. The Construction of a packaged wastewater treatment system with polishing filter 2. Retention of mobile home and domestic entrance with all ancillary site works

Knock , Castletown , Navan Co. Meath

49m
KA200043N/A16 Jan 2020

proposed dwelling house, wastewater treatment system and soil polishing filter, retention permission for existing vehicular entrance, retention permission for temporary use of static mobile home on the site and all associated site development works

Knock , Castletown , Navan Co. Meath

51m
KA190566CONDITIONAL8 May 2019

the retention of a dormer window to rear of dwelling and a domestic garage with loft storage and all ancillary site works

Knock , Castletown , Navan Co. Meath

62m
211910CONDITIONAL29 Sept 2021

planning permission for a proposed dwelling house, waste water treatment system and soil polishing filter, retention permission for existing vehicular entrance, retention permission for temporary use of static mobile home on the site and all associated site development works

Knock Castletown , Navan , Co. Meath

329m
2683CONDITIONAL9 Mar 2026

the development will consist of the following: (1) To construct a single storied type dwelling house and a detached domestic garage. (2) To install a proprietary waste water treatment unit and percolation area. (3) close up an existing agricultural entrance and make a new entrance onto the road. (4) All ancillarey site development works

Knock , Castletown , Co. Meath

527m
22934CONDITIONAL14 Jul 2022

planning permission for construction of proposed private residence, new entrance onto road, installation of wastewater treatment system and percolation area, proposed detached domestic garage, proposed stables, including all ancillary site works

Knock , Castletown , Navan Co. Meath

551m
KA201098CONDITIONAL14 Aug 2020

the construction of a single storey dwelling, packaged wastewater treatment system with polishing filter, new entrance and all ancillary site works

Knock , Castletown , Navan Co. Meath

576m
KA180477UNCONDITIONAL11 May 2018

construction of a single storey extension to side of existing dwelling consisting of two bedrooms and en-suite bathroom including all associated site works

Knock Castletown , Navan , Co. Meath

722m
2560815REFUSED2 Aug 2025

the development will consist of the construction of a single storey dwelling, double domestic garage with loft storage, wastewater treatment system with polishing filter new entrance and all ancillary site works

Knock , Castletown , Navan

722m
2560021REFUSED23 Dec 2024

the development will consist of the construction of a single storey dwelling, double domestic garage with loft storage, wastewater treatment system with polishing filter new entrance and all ancillary site works. Significant further information/revised plans submitted on this application

Knock , Castletown , Navan Co. Meath

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?