Three Steps , The Moy , Summehill

N/A

Planning application TA180729

Meath - Meath County Council

Proposed Development

2 four bedroom 2 storey houses with treatment system and 2 no wells. Existing entrance for access and all associated site works

View the full application file on the council's planning portal →

Application Details

Location
Three Steps , The Moy , Summehill
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Meath County Council
Site Area
1.017 ha
Floor Area
1036 sq m
Residential Units
2

Timeline

Registration Date
3 July 2018
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

14m
TA180892N/A10 Aug 2018

planning permission is sought for 2 four bedroom, 2 storey houses, with 2 Packaged wastewater treatment systems and polishing filters. Discharged to: Ground water, Trench invert level (m): 0.60 treatment system and 2 no. wells. Existing entrance for access and all associated site works

Three Steps , The Moy , Summehill Co. Meath

16m
TA190569N/A8 May 2019

planning permission is sought for 2, four bedroom, 2 story houses, with 2 Packaged wastewater treatment systems and polishing filters. Discharged to: Ground water. Trench invert level(m): 0.60 treatment system and 2 no. wells. New shared entrance for access to site and all associated site works

Three Steps , The Moy , Summerhill Co. Meath

17m
TA180845N/A30 Jul 2018

2 four bedroom, 2 storey houses, with Packaged wastewater treatment system and polishing filter. Discharged to: Ground water, Trench invert level (m): 0.60 treatment system and 2 no. wells. Existing entrance for access and all associated site works

Three Steps , The Moy , Summehill Co. Meath

28m
TA200542CONDITIONAL22 Apr 2020

2 four bedroom 2 storey houses, with 2 Packaged wastewater treatment systems and polishing filters. Discharged to Ground water. Trench invert level (m): 0.60 treatment system and 2 no wells. New entrance for access and all associated site works. Significant further information/revised plans submitted on this application

Three Steps , The Moy , Summerhill Co. Meath

32m
211813CONDITIONAL15 Sept 2021

two storey dwelling, detached domestic garage, entrance and driveway. The development also includes installation of a proprietary waste water treatment system and polishing filter together with all associated site works

The Moy , Summerhill , Co Meath

46m
RA200302N/A6 Mar 2020

two four bedroom two storey houses, with 2 packaged wastewater treatment systems and polishing filters. Discharged to groundwater. Trench invert level (m) .60 treatment system and 2 no wells. New entrance for access and all associated site works.

Three Steps , The Moy , Summerhill

68m
TA180988N/A29 Aug 2018

planning permission is sought for 2 four bedroom, 2 storey houses, with 2 Packaged wastewater treatment systems and polishing filters. Discharged to: Ground water, Trench invert level (m): 0.60 treatment system and 2 no. wells. Existing entrance for access and all associated site works

Three Steps , The Moy , Summehill Co. Meath

134m
TA171043CONDITIONAL8 Sept 2017

the development will consist of the demolition of existing stables and construction of a two storey structure that will be used for storage purposes, domestic garage, a home gym and home study/office to rear of existing dwelling

The Moy , Summerhill , Co. Meath

149m
2460645CONDITIONAL15 Aug 2024

planning permission for the construction of a new single-storey dwelling, together with a new site entrance, effluent treatments system tank and percolation area, together with all associated site works and landscaping

The Moy , Summerhill Enfield , Co. Meath

330m
TA170933CONDITIONAL11 Aug 2017

the development will consist of a storey and a half style dwelling, a detached domestic garage, wasterwater disposal system, domestic site entrance and all associated site works

Summerhill Demesne , Summerhill , Co. Meath

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.